Author: Lunin, A.
Paper Title Page
MOZGBD3 Performance of the First LCLS-II Cryomodules: Issues and Solutions 34
 
  • N. Solyak, E. Cullerton, J. Einstein-Curtis, E.R. Harms, B.D. Hartsell, J.P. Holzbauer, T.N. Khabiboulline, A. Lunin, Y.M. Pischalnikov, R.P. Stanek, G. Wu
    Fermilab, Batavia, Illinois, USA
  • O. Napoly
    CEA/DSM/IRFU, France
 
  LCLS-II 4 GeV linac is on the middle production stage. Linac contains 40 cryomodules of 1.3 GHz and 3 cryomodules of 3.9 GHz, including spares. Fermilab and JLAB share responsibility for cryomodule design, assembly and test. Paper will overview the performance of the cryomodules it the tests, lessons learned and modifications in design to improve performance.  
slides icon Slides MOZGBD3 [8.630 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-MOZGBD3  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPMK010 LCLS-II Cryomodules Production at Fermilab 2652
 
  • T.T. Arkan, J.N. Blowers, C.M. Ginsburg, C.J. Grimm, J.A. Kaluzny, A. Lunin, Y.O. Orlov, K.S. Premo, R.P. Stanek, G. Wu
    Fermilab, Batavia, Illinois, USA
 
  Funding: DOE
LCLS-II is a planned upgrade project for the linear coherent light source (LCLS) at SLAC. The LCLS-II linac will consist of thirty-five 1.3 GHz and two 3.9 GHz superconducting RF continuous wave (CW) cryomodules that Fermilab and Jefferson Lab are currently producing in collaboration with SLAC. The LCLS-II 1.3 GHz cryomodule design is based on the European XFEL pulsed-mode cryomodule design with modifications needed for CW operation. Two prototype cryomodules had been assembled and tested. After prototype cryomodule tests, both laboratories have increased cryomodule production rate to meet the challenging LCLS-II project installation schedule requirements of approximately one cryomodule per month per laboratory. Fermilab is at half point for the production, meaning that 6 cryomodules are fully assembled and tested. This paper presents Fermilab Cryomodule Assembly Facility (CAF) infrastructure for the LCLS-II cryomodules assembly, production experience at the half point emphasizing the challenges and mitigations.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPMK010  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPML022 3.9 GHz Power Coupler Design and Tests for LCLS-II Project 2727
 
  • N. Solyak, I.V. Gonin, C.J. Grimm, E.R. Harms, T.N. Khabiboulline, A. Lunin, O.V. Prokofiev, G. Wu
    Fermilab, Batavia, Illinois, USA
 
  LCLS-II linac requires two 3.9 GHz cryomodules (eight cavities per CM), operating up to 16MV/m in cw regime. Fermilab has designed and built few prototypes of the cavity and auxiliaries and tested them at the vertical and horizontal cryostats. Fundamental power coupler, based on existing design (FLASH, XFEL) was redesign for 2kW average power. We built three prototypes and tested them at room temperature test stand. One coupler was assembled on the cavity and tested at horizontal cryostat as part of design verification program. Test results and comparison with simulations are discussed in this paper.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPML022  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPML023 Design and Test Results of the 3.9 GHz Cavity for LCLS-II 2730
 
  • N. Solyak, S. Aderhold, S.K. Chandrasekaran, C.J. Grimm, T.N. Khabiboulline, A. Lunin, O.V. Prokofiev, G. Wu
    Fermilab, Batavia, Illinois, USA
 
  The LCLS-II project uses sixteen 3.9 GHz superconduct-ing cavities to linearize energy distribution before the bunch compressor. To meet LCLS-II requirements origi-nal FNAL design used in FLASH and XFEL was signifi-cantly modified to improve performance and provide reliable operation up to 16 MV/m in cw regime [1-3]. Four prototype cavities were built and tested at vertical cryo-stat. After dressing, one cavity was assembled and tested at horizontal cryostat as part of design verification pro-gram. All auxiliaries (magnetic shielding, power and HOM couplers, tuner) were also re-designed and tested with this cavity. In this paper we will discuss cavity and coupler design and test results.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPML023  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)