Paper |
Title |
Page |
MOPMF050 |
LHC Operational Experience of the 6.5 TeV Proton Run with ATS Optics |
216 |
|
- M. Pojer, M. Albert, R. Alemany-Fernández, T. Argyropoulos, E. Bravin, A. Calia, G.E. Crockford, S.D. Fartoukh, K. Fuchsberger, R. Giachino, M. Giovannozzi, G.H. Hemelsoet, M. Hostettler, W. Höfle, Y. Le Borgne, D. Nisbet, L. Ponce, S. Redaelli, B. Salvachua, M. Solfaroli, R. Suykerbuyk, D.J. Walsh, J. Wenninger, M. Zerlauth
CERN, Geneva, Switzerland
|
|
|
In May 2017, the CERN Large Hadron Collider (LHC) restarted operations at 6.5 TeV using the Achromatic Telescopic Squeeze (ATS) scheme with a target beta-star of 40 cm in ATLAS and CMS. The number of bunches was progressively increased to a maximum of 2556 with emittances of 2.5 um. In August, several machine parameters had to be re-tuned to mitigate beam loss induced instabilities and maintain a steady increase of the instantaneous luminosity. The use of a novel beam type and filling pattern produced in the injectors, allowed filling the machine with very low emittance beam (1.5 um) achieving an equivalent luminosity with 1868 bunches. In September, the beta-star was further lowered to 30 cm (using, for the first time, the telescopic technique of the ATS) and the bunch intensity pushed to 1.25·1011 protons. In the last 3 months of 2017, the LHC produced more than 500 pb-1 of integrated luminosity per day, delivering to each of the high luminosity experiments 50.6 fb-1, 10% above the 2017 target. A general overview of the operational aspects of the 2017 proton run will be presented.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2018-MOPMF050
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
MOPMF051 |
LHC Operational Scenarios During 2017 Run |
220 |
|
- B. Salvachua, M. Albert, R. Alemany-Fernández, T. Argyropoulos, E. Bravin, H. Burkhardt, G.E. Crockford, JCD. Dumont, S.D. Fartoukh, K. Fuchsberger, R. Giachino, M. Giovannozzi, G.H. Hemelsoet, W. Höfle, J.M. Jowett, Y. Le Borgne, D. Nisbet, M. Pojer, L. Ponce, S. Redaelli, M. Solfaroli, R. Suykerbuyk, D.J. Walsh, J. Wenninger, M. Zerlauth
CERN, Geneva, Switzerland
|
|
|
During 2017, the Large Hadron Collider LHC delivered luminosity for different physics configuration in addtion to the nominal 6.5 TeV proton-proton run. About 18.5 days were dedicated to commission and to deliver special physics to the experiments. Condifurations with large beta-star of 19 m and 24 m were prepared for luminosity calibration with Van de Meer scans. A proton-proton run at 2.51 TeV took place during the last weeks of November to provide reference data for the heavy ion (Pb-Pb, p-Pb) collisions at the same equivalent nucleon energy . A very short (0.5 days) but effective ion run was scheduled where the LHC saw the first Xe beams collissions and delivered around 3 ub-1 to ATLAS and CMS. The run ended with a low event pile-up run at 6.5TeV. This contribution summarizes the operational aspects and delivered targets for the different configurations.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2018-MOPMF051
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
TUPAF020 |
Performance of the CERN Low Energy Ion Ring (LEIR) with Xenon beams |
705 |
|
- R. Alemany-Fernández, S.C.P. Albright, O. Andujar, M.E. Angoletta, J. Axensalva, H. Bartosik, G. Baud, N. Biancacci, M. Bozzolan, S. Cettour Cave, K. Cornelis, J. Dalla-Costa, M. Delrieux, A. Dworak, A. Findlay, F. Follin, A. Frassier, M. Gabriel, A. Guerrero, M. Haase, S. Hirlaender, S. Jensen, V. Kain, L.V. Kolbeck, Y. Le Borgne, D. Manglunki, O. Marqversen, S. Massot, D. Moreno Garcia, D.J.P. Nicosia, S. Pasinelli, L. Pereira, D. Perez, A. Rey, J.P. Ridewood, F. Roncarolo, Á. Saá Hernández, R. Scrivens, O.G. Sveen, G. Tranquille, E. Veyrunes
CERN, Geneva, Switzerland
|
|
|
In 2017 the CERN Low Energy Ion Ring demonstrated once more the feasibility of injecting, accumulating, cooling and accelerating a new nuclei, 129Xe39 . The operation of this new ion species started at the beginning of March with the start up of the xenon ion source and the Linac3. Ten weeks later the beam arrived to the Low Energy Ion Ring (LEIR) triggering the start of several weeks of beam commissioning in view of providing the injector complex with Xenon beams for different experiments and a series of machine development experiments in LEIR. Two types of beams were setup, the so called EARLY beam, with a single injection into LEIR from Linac3, and the NOMINAL beam with up to seven injections. 2017 was as well an interesting year for LEIR because several improvements in the control system of the accelerator and in the beam instrumentation were done in view of increasing the machine reliability. This paper summarises the beam commissioning phase and all the improvements carried out during 2017.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF020
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|