TUPAK005 Upgrade Plan of J-PARC MR - Toward 1.3 MW Beam Power 966
 
  • T. Koseki
    KEK, Ibaraki, Japan
 
  The Main Ring Synchrotron (MR), a 30-GeV slow cycling proton synchrotron, delivers intense proton beam to a long-baseline neutrino oscillation experiment, T2K, by fast extraction and to an experimental facility, which is called hadron hall by slow extraction. The achieved beam intensities for routine operations are 470 kW ( 2.4 x 1014 ppp) for the fast extraction and 44 kW ( 5.1 x 1013 ppp) for the slow extraction. In order to increase the beam intensity, a plan to replace the magnet power supplies are now in progress for operation with a higher repetition rate. After the replacement, the cycle time will be shortened about a half and increase beam intensities two times larger for the fast extraction. In addition, a further upgrade plan for the fast extraction is mainly reinforcement of rf power supplies. The goal of the upgrade plan is reaching 1.3 MW beam power for the neutrino experiment.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAK005  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAL017 Performance and Status of the J-PARC Accelerators 1038
 
  • K. Hasegawa, N. Hayashi, M. Kinsho, H. Oguri, K. Yamamoto, Y. Yamazaki
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken, Japan
  • T. Koseki, F. Naito, M. Yoshii
    KEK, Tokai, Ibaraki, Japan
  • N. Yamamoto
    J-PARC, KEK & JAEA, Ibaraki-ken, Japan
 
  The J-PARC is a high intensity proton facility and the accelerator consists of a 400 MeV linac, a 3 GeV Rapid Cycling Synchrotron (RCS) and a 30 GeV Main Ring Synchrotron (MR). Regarding 3 GeV beam from the RCS, we delivered it at 150 kW to the materials and life science experimental facility (MLF), for the neutron and muon users. The beam powers for the neutrino experiment at 30 GeV was 420 kW in May 2016, but increased to 470 kW in February 2017 thanks to the change and optimization of operation parameters. For the hadron experimental facility which uses a slow beam extraction mode at 30 GeV, we delivered beam at a power of 37 kW, after the recovery from a trouble at an electro static septum. We have experienced many failures and troubles to impede full potential and high availability. In this report, operational performance and status of the J-PARC accelerators are presented.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAL017  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)