Author: Koop, I.
Paper Title Page
MOZGBF2 Status of the FAIR Project 63
 
  • P.J. Spiller, M. Bai, O. Boine-Frankenheim, A. Dolinskyy, F. Hagenbuck, C.M. Kleffner, K. Knie, S. Menke, C. Omet, A. Schuhmann, H. Simon, M. Winkler
    GSI, Darmstadt, Germany
  • J. Blaurock, M. Ossendorf
    FAIR, Darmstadt, Germany
  • I. Koop
    BINP SB RAS, Novosibirsk, Russia
  • D. Prasuhn, R. Tölle
    FZJ, Jülich, Germany
 
  The realization of the new Facility for Antiproton and Ion Research, FAIR at GSI, Germany, has advanced significantly. The civil construction process of the Northern part of the building complex, including the excavation of the SIS100 synchrotron tunnel has been launched end of 2017. On site of the GSI campus, major preparations and upgrade measures for the injector operation of the existing accelerator facilities are ongoing and will be completed mid of 2018. The shielding of the SIS18 accelerator tunnel has been enhanced for the booster operation at high repetition rates and high intensity Proton beams. Two new transformer stations were set-up and commissioned which will provide the required pulse and common power for FAIR. All major contracts for series production of SIS100 components have been signed and a large number of the superconducting SIS100 magnets has been produced and accepted. Major testing infrastructures for superconducting magnets of SIS100 and Super-FRS have been set-up at JINR, CERN and GSI. Also for all other FAIR accelerator systems, the procurement of the components is progressing well  
slides icon Slides MOZGBF2 [4.266 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-MOZGBF2  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPMK011 VEPP-5 Injection Complex: New Possibilities for BINP Electron-Positron Colliders 371
 
  • Yu. Maltseva, A.V. Andrianov, K.V. Astrelina, V.V. Balakin, A.M. Batrakov, O.V. Belikov, D.E. Berkaev, M.F. Blinov, D. Bolkhovityanov, A. Butakov, E.V. Bykov, N.S. Dikansky, F.A. Emanov, A.R. Frolov, V.V. Gambaryan, K. Gorchakov, Ye.A. Gusev, S.E. Karnaev, G.V. Karpov, A.S. Kasaev, E. Kenzhbulatov, V.A. Kiselev, S. Kluschev, A.A. Kondakov, I. Koop, I.E. Korenev, N.Kh. Kot, V.R. Kozak, A.A. Krasnov, S.A. Krutikhin, I.V. Kuptsov, G.Y. Kurkin, N.N. Lebedev, A.E. Levichev, P.V. Logatchov, A.A. Murasev, V. Muslivets, D.A. Nikiforov, An.A. Novikov, A.V. Ottmar, A.V. Pavlenko, I.L. Pivovarov, V.V. Rashchenko, Yu. A. Rogovsky, S.L. Samoylov, N. Sazonov, A.V. Semenov, D.B. Shwartz, A.N. Skrinsky, A.A. Starostenko, D.A. Starostenko, A.G. Tribendis, A.S. Tsyganov, S.P. Vasichev, S.V. Vasiliev, V.D. Yudin, I.M. Zemlyansky, A.N. Zhuravlev
    BINP SB RAS, Novosibirsk, Russia
  • A.V. Andrianov, V.V. Balakin, F.A. Emanov, I. Koop, A.A. Krasnov, A.E. Levichev, D.A. Nikiforov, A.V. Pavlenko, Yu. A. Rogovsky, D.B. Shwartz, A.A. Starostenko
    NSU, Novosibirsk, Russia
  • A.I. Mickailov
    Budker INP & NSU, Novosibirsk, Russia
  • A.G. Tribendis
    NSTU, Novosibirsk, Russia
 
  VEPP-5 Injection Complex (IC) is designed to supply BINP RAS colliders with high energy electron and positron beams. Recently constructed K-500 beam transfer line connects IC to both VEPP-4M and VEPP-2000 colliders. IC two collider operation was successfully performed in 2016. Nowadays, research on improvement of IC productivity is carried out, in particular 10.94 MHz RF cavity instead of 700 MHz one was installed and a new electron gun installation is expected to be this summer. Moreover, longitudinal beam profile measurements in IC damping ring using a streak-camera were carried out. Operation experience of IC and results of longitudinal beam profile measurements are reported.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-MOPMK011  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)