SIS100 Tunnel Design and Civil Construction Status |
927 |
|
- C. Omet, J. Falenski, H. Kisker, K. Konradt, P.J. Spiller
GSI, Darmstadt, Germany
- A. Fischer
FAIR, Darmstadt, Germany
|
|
|
As the FAIR Project is proceeding, building designs have been frozen and the according work packages tendered. For the future FAIR main driver accelerator, SIS100, the 1.1 km long accelerator tunnel "T110", has been planned 17 m deep under ground. In this article, environmental boundary conditions, the chosen layout and the current status of civil construction is presented.
|
|