THPMK008 |
Commissioning of the Storage Ring for the Kharkov Generator of X-Ray Radiation NESTOR |
4307 |
|
- A.A. Shcherbakov, V.P. Androsov, S.V. Bazarov, V.N. Berezka, O. Bezditko, A.V. Cherkashin, A.V. Gevchuk, P. Gladkikh, S.P. Gokov, A.N. Gordienko, V.A. Grevtsev, A. Gvozd, V.E. Ivashchenko, A.A. Kalamayko, I.I. Karnaukhov, I.M. Karnaukhov, V.P. Kozin, V.P. Lyashchenko, V.S. Margin, N.I. Mocheshnikov, M. Moisieienko, A. Mytsykov, F.A. Peev, O.V. Ryezayev, V.P. Sergienko, V.O. Shpagina, N.F. Shul'ga, V. Skomorokhov, D.V. Tarasov, V.I. Trotsenko, V.V. Tsyats'ko, A.Y. Zelinsky, O.P. Zolochevskij, O.D. Zvonarjova
NSC/KIPT, Kharkov, Ukraine
- J.I.M. Botman
TUE, Eindhoven, The Netherlands
|
|
|
During 2015-2017 the X-ray source NESTOR (New Electron STOrage Ring) based on a storage ring with low beam energy and Compton scattering of intense laser beam is under commissioning at the National Science Center "Kharkov Institute of Physics and Technology Institute" (NSC KIPT). The start-up of the injector and storage ring is one of the basic task for the facility commissioning. In the paper, the results of the NESTOR X-ray source 225 MeV electron storage ring commissioning are described and further plans are discussed
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2018-THPMK008
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
THPML020 |
The First Results of Trial Operation and Performance Improve of the 100 MeV/ 100 kW Electron Linear Accelerator of the NSC KIPT SCA Neutron Source |
4693 |
|
- A.Y. Zelinsky, O.E. Andreev, V.P. Androsov, O. Bezditko, O.V. Bykhun, A.N. Gordienko, V.A. Grevtsev, A. Gvozd, V.E. Ivashchenko, I.I. Karnaukhov, I.M. Karnaukhov, V.P. Lyashchenko, M. Moisieienko, A.V. Reuzayev, D.V. Tarasov, V.I. Trotsenko
NSC/KIPT, Kharkov, Ukraine
- Y.L. Chi
IHEP, Beijing, People's Republic of China
|
|
|
The NSC KIPT SCA Neutron Source uses 100 MeV/ 100 kW electron linear accelerator as a driver for the generation of the initial neutrons. The trial operation of the accelerator was started in 2018. To provide design electron beam parameters is the primary task of the first stage of the trial operation. During the first stage of the accelerator operation the following tasks were under consideration: minimization of the electron beam losses along accelerator, providing of the stable electron beam pulse current, adjustment of the electron beam position along accelerator and providing of the uniform electron beam distribution at the tungsten neutron generating target. The main results of the accelerator operation and methods of performance improve are described in the paper.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2018-THPML020
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
THPML021 |
Individual Acceptance Testing and Comprehensive Testing of NSC KIPT SCA Neutron Source Technological Systems and Equipment |
4696 |
|
- A.Y. Zelinsky, O.V. Bykhun, I.M. Karnaukhov, A. Mytsykov, I. Ushakov
NSC/KIPT, Kharkov, Ukraine
- I. Bolshinsky
INL, Idaho Falls, Idaho, USA
- Y. Gohar
ANL, Argonne, Illinois, USA
|
|
|
During 2016-2017 the installation, assembling and commissioning of the NSC KIPT SCA Neutron Source technological systems were completed. The facility was designed and developed by NSC KIPT of Ukraine in collaboration with ANL of USA. The construction of the neutron source facility was started in 2012. The neutrons of the subcritical assembly are generated by 100 MeV/ 100 kW electron beam uniformly distributed at the surface of the tungsten target. It is supposed that the facility will be used to perform basic and applied nuclear research, produce medical isotopes, and train nuclear specialists. The individual acceptance testing and comprehensive testing were conducted for the technological and engineering systems of the neutron source. The tests were performed in compliance with programs and methodologies agreed by the State Nuclear Regulatory Inspectorate of Ukraine. The testing results confirmed compliance of the equipment with technical specifications, standards, regulations and rules on nuclear and radiation safety and preparedness of these systems for trial operation with the KIPT neutron source. The trial operation of the NSC KIPT SCA 'Neutron Source' has been started.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2018-THPML021
|
|