WEPMF062 Simulation of Cavity Conditioning for the Diamond SCRF Cavity 2509
 
  • S.A. Pande, C. Christou, P. Gu
    DLS, Oxfordshire, United Kingdom
 
  Diamond SCRF cavities are pulse conditioned every week in order to keep them operating reliably. During conditioning, the cavities are detuned in order to sweep the standing wave through the waveguide. To match these cavities at lower voltage (typically < 1.4 MV) and at higher power, 3 stub tuners are used in the waveguide feed. Simulations with CST studio show that a strong SW field exists between the RF window and the matching posts. As the cavity is detuned the electric field maximum passes through the window causing heating of the ceramic. Temperature measurements with thermal camera reveal that the temperature of the window increases to maximum when the cavity is detuned towards higher frequency. Based on the simulation results and the measurements, it was decided to reduce the conditioning voltage. These results are summarised.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPMF062  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPMF007 Commissioning of the Hybrid Superconducting/Normal Conducting RF System in the Diamond Storage Ring 4042
 
  • C. Christou, A.G. Day, P. Gu, P.J. Marten, S.A. Pande, D. Spink, A. Tropp
    DLS, Oxfordshire, United Kingdom
 
  Two 500 MHz HOM damped normal conducting cavities have been installed in the Diamond storage ring to ensure continuity of operation of Diamond in the event of a failure of one of the two existing superconducting cavities. Following receipt from the manufacturer, the cavities were incorporated into an assembly including vacuum pumping, cooling and interlocked diagnostics and then tested for vacuum integrity and RF performance. Both cavities were then conditioned up to high power in Diamond's RF test facility before being installed in the storage ring in August and November 2017. Conditioning and operation has been carried out using a new digital LLRF system. Results of acceptance tests and commissioning with power and beam are presented, together with the current status of the hybrid RF system and options for further improvement of the system in the near future.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-THPMF007  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)