Paper | Title | Page |
---|---|---|
TUPAF089 | Initial Measurements on a New 108 MHz 4-Rod CW RFQ Prototype for the HLI at GSI | 946 |
|
||
Funding: Work supported by BMBF Contr. No. 05P15RFBA and HIC for FAIR The High Charge State Injector (HLI) at the GSI Helmholtz Centre for Heavy Ion Research in Darmstadt, Germany, is one of the two injector linacs for the Universal Linear Accelerator (UNILAC) and is also planned to serve as dedicated injector for a proposed superconducting CW linac for heavy element research. Within the scope of an intended CW upgrade of the HLI front end, a replacement for the existing 4-rod RFQ is desirable since its stable operation and performance is severely impeded by mechanical vibrations of the electrodes and a high thermal sensitivity*. With the aim of suppressing mechanical vibrations and providing efficient cooling considering high power CW operation, a completely new and improved 4-rod design was developed** with a focus on structural mechanical simulations using ANSYS. In order to validate the simulated RF performance, thermal behavior and structural mechanical characteristics, a 6-stem prototype was manufactured***. Initial low power RF measurements and basic piezo actuated mechanical investigations were done and the anticipated properties could be confirmed prior to planned high power RF tests and further mechanical vibration studies. * D. Koser et al., THPIK021, Proc. of IPAC2017 ** D. Koser et al., MOPOY020, Proc. of IPAC2016 *** D. Koser et al., TUPLR057, Proc. of LINAC2016 |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF089 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
THYGBF3 | Challenges of FAIR Phase 0 | 2947 |
|
||
After two-year's shutdown, the GSI accelerators plus the latest addition of storage ring CRYRING, will be back into operation in 2018 as the FAIR phase 0 with the goal to fulfill the needs of scientific community and the FAIR accelerators and detector development. Even though GSI has been well known for its operation of a variety of ion beams ranging from proton up to uranium for multi research areas such as nuclear physics, astrophysics, biophysics, material science, the upcoming beam time faces a number of challenges in re-commissioning its existing circular accelerators with brand new control system and upgrade of beam instrumentations, as well as in rising failures of dated components and systems. The cycling synchrotron SIS18 has been undergoing a set of upgrade measures for fulfilling future FAIR operation, among which many measures will also be commissioned during the upcoming beam time. This paper presents the highlights of the challenges such as re-establishing the high intensity heavy ion operation as well as parallel operation mode for serving multi users. The status of preparation including commissioning results will also be reported. | ||
![]() |
Slides THYGBF3 [2.948 MB] | |
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-THYGBF3 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |