Author: Gatera, A.
Paper Title Page
MOPML017 Status and Development of the MYRRHA Injector 432
 
  • D. Mäder, H. Höltermann, D. Koser, B. Koubek, K. Kümpel, P. Müller, U. Ratzinger, M. Schwarz, W. Schweizer
    BEVATECH, Frankfurt, Germany
  • C. Angulo, J. Belmans, D. Davin, W. De Cock, P. Della Faille, F. Doucet, A. Gatera, Pompon, F.F. Pompon, D. Vandeplassche
    Studiecentrum voor Kernenergie - Centre d'Étude de l'énergie Nucléaire (SCK•CEN), Mol, Belgium
  • M. Busch, H. Hähnel, H. Podlech
    IAP, Frankfurt am Main, Germany
 
  The MYRRHA project aims at coupling a cw 600 MeV, 4 mA proton linac with a sub-critical reactor as the very first prototype nuclear reactor to be driven by a particle accelerator (ADS). Among several applications, MYRRHA main objective is to demonstrate the principle of partitioning and transmutation (P&T) as a viable solution to drastically reduce the radiotoxicity of long-life nuclear waste. For this purpose, the linac needs an unprecedented level of reliability in terms of allowable beam trips. The normal conducting injector delivers 16.6 MeV protons to the superconducting main linac. The first section of the injector (up to 5.9 MeV) consists of an ECR source, a 4-Rod-RFQ and a rebunching line followed by 7 individual CH-type cavities. This entire section will be set up and operated by SCK·CEN in Louvain-la-Neuve, Belgium, for ample performance and reliability testing. The first CH cavity has been sent for power tests to IAP Frankfurt, Germany. The most recent status of all cavities, couplers and the beam diagnostics of the MYRRHA injector is presented in this paper.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-MOPML017  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAF003 Integrated Prototyping in View of the 100 MeV Linac for Myrrha Phase 1 661
 
  • D. Vandeplassche, J. Belmans
    SCK•CEN, Mol, Belgium
  • C. Angulo, D. Davin, W. De Cock, P. Della Faille, F. Doucet, A. Gatera, Pompon, F.F. Pompon
    Studiecentrum voor Kernenergie - Centre d'Étude de l'énergie Nucléaire (SCK•CEN), Mol, Belgium
  • D. Bondoux, F. Bouly
    LPSC, Grenoble Cedex, France
  • H. Höltermann, D. Mäder
    BEVATECH, Frankfurt, Germany
  • C. Joly, G. Olry, H. Saugnac
    IPN, Orsay, France
  • M. Loiselet, N. Postiau, L. Standaert
    UCL, Louvain-la-Neuve, Belgium
  • H. Podlech, U. Ratzinger
    IAP, Frankfurt am Main, Germany
 
  Funding: Work partially supported by the European Commission H2020 programme MYRTE #662186
The MYRRHA project borne by SCK•CEN, the Belgian Nuclear Research Centre, aims at realizing a pre-industrial Accelerator Driven System (ADS) for exploring the transmutation of long lived nuclear waste. The linac for this ADS will be a High Power Proton Accelerator delivering 2.4 MW CW beam at 600 MeV. It has to satisfy stringent requirements for reliability and availability: a beam-MTBF of 250h is targeted. The reliability goal is pursued through a phased approach. During Phase 1, expected till 2024, the MYRRHA linac up to 100 MeV will be constructed. It will allow to evaluate the reliability potential of the 600 MeV linac. It will also feed a Proton Target Facility in which radioisotopes of interest will be collected through an ISOL system. This contribution will focus on the transition to integrated prototyping, which will emphasize (i) a test platform consisting of the initial section of the normal conducting injector (5.9 MeV), (ii) the realization of a complete cryomodule for the superconducting linac and of its cryogenic valve box. The cryomodule will house two 352 MHz single spoke cavities operated at 2K.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF003  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)