TUPAF083 SIS100 Tunnel Design and Civil Construction Status 927
 
  • C. Omet, J. Falenski, H. Kisker, K. Konradt, P.J. Spiller
    GSI, Darmstadt, Germany
  • A. Fischer
    FAIR, Darmstadt, Germany
 
  As the FAIR Project is proceeding, building designs have been frozen and the according work packages tendered. For the future FAIR main driver accelerator, SIS100, the 1.1 km long accelerator tunnel "T110", has been planned 17 m deep under ground. In this article, environmental boundary conditions, the chosen layout and the current status of civil construction is presented.  