Paper | Title | Page |
---|---|---|
WEPAF032 | An Alternative Fast Orbit Feedback Design of HEPS | 1888 |
|
||
The High Energy Photon Source (HEPS) is a fourth generation light source in China and will be built in this year. The emittance of HEPS storage ring is approaching diffraction limit and the circumstance of the ring is about 1.3 kilometres. To stabilize the electron beam, fast orbit feedback (FOFB) system is prerequisite. In this paper, the requirements on the HEPS beam stability are discussed and an alternative FOFB design based on DBPM are introduced with algorithm and architecture. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPAF032 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
WEPAL004 | The Algorithm Research of DBPM for HEPS | 2147 |
|
||
The High Energy Photon Source (HEPS) is a 6-GeV, low-emittance, 1300m scale new generation photon source to be built in China [1]. As a key component, digital beam positon monitor (DBPM) needs to make the beam slow acquisition's resolution up to 0.1um. Because of the high requirements and large expenses, we designed our own DBPM system. In this paper, I will present the algorithm of our BPM. The algorithm is based on Discrete Fourier Transform (DFT) method and tested in BEPCII with using our own designed hardware. The Turn-by-Turn's resolution tested in BEPCII is 0.62um (STD value, 65080 counts, 1.2432MHz), the fast acquisition's resolution is 0.32um (STD value, 65080 counts, 10kHz), the slow acquisition's resolution is 0.18um (STD value, 65080 counts, 10Hz). | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPAL004 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
WEPAL005 | Beam Size Measurement and PSF Evaluate of KB Mirror Monitor at SSRF | 2151 |
|
||
Funding: Work supported by National Nature Science Foundation of China(11605213) A Kirkpatrick Baez mirror imaging system was designed and installed to measure the transverse beam size and emittance of SSRF storage ring. Two crossed cylindrical mirrors are used to image the dipole source point in the horizontal and vertical direction. Both mirrors could be moved in and out in order to interchangeable with an original X-ray pinhole system. Hard X-ray with peak energy of 20.5 keV was focused at the X-ray scintillator camera. Aberration and point spread function which would cause image blur were evaluated. System commissioning and optimization have been done. PSF measurement was acquired using beam based calibration scheme by varying the beam images with different quadrupole settings and fitting them with the corresponding theoretical beam sizes. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPAL005 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |