Paper |
Title |
Page |
TUPAF037 |
Validation of the CERN PS Eddy Current Injection Septa |
768 |
|
- M. Hourican, B. Balhan, J.C.C.M. Borburgh, T. Masson, A. Sanz Ull
CERN, Geneva, Switzerland
|
|
|
As part of the upgrade of the CERN PS accelerator from 1.4 GeV to 2 GeV, new injection septa have been developed. The system is comprised of a pulsed eddy current septum magnet and a pulsed eddy current bumper magnet. Both magnets will be housed in a common vacuum vessel and powered by independent power converters. In-depth studies and simulations have been performed to reduce as much as possible the leak field by designing specific magnetic shielding, combined with dual function beam impedance shielding. A prototype magnet was built and measured to validate the simulations. The final complete system will be bake-able at 200C and uses demineralised water for cooling. Closed circuit cooling systems have been integrated to reduce risks of vacuum leaks. This report describes the electromechanical design from the concept and simulation stages to the prototyping and final manufacturing. Results of the initial magnetic measurements, including field homogeneity and leak field mitigation methods are presented.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF037
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
TUPAF053 |
Optimization of Diffuser (Pre-Scatterer) Configurations for Slow Extraction Loss Reduction at Electrostatic Septa |
830 |
|
- B. Goddard, B. Balhan, J.C.C.M. Borburgh, M.A. Fraser, L.O. Jorat, V. Kain, C. Lolliot, L.S. Stoel, P. Van Trappen, F.M. Velotti
CERN, Geneva, Switzerland
- D. Barna
Wigner Research Centre for Physics, Institute for Particle and Nuclear Physics, Budapest, Hungary
- V.P. Nagaslaev
Fermilab, Batavia, Illinois, USA
|
|
|
Uncontrolled beam loss at the electrostatic septum is a performance limit for several existing or planned high power hadron accelerators delivering slow-extracted spills to fixed targets. A passive diffuser, or pre-scatterer, in a suitable configuration has been shown to reduce such beamloss significantly, with the actual gain factor depending on the parameters and details of the extraction process and hardware. In this paper, the optimization of diffuser configurations is investigated for a range of beam energies and extraction conditions, and the sensitivity to the available parameters explored via simulation results. The advantages and limitations of the diffuser are discussed and conclusions drawn concerning the specific case studies of the 8 GeV Fermilab debuncher ring and 400 GeV CERN SPS.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF053
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
WEPMF075 |
Performance Measurements and Analysis of Jitter Like Events for the PS Injection Kicker System |
2549 |
|
- A. Ferrero Colomo, J.C.C.M. Borburgh, L. Ducimetière, L.M.C. Feliciano, V. Forte, M.A. Fraser, T. Kramer, L. Sermeus
CERN, Geneva, Switzerland
|
|
|
In the framework of the LIU project, several modifications have been made to the CERN PS injection kicker system during the winter stop 2016-2017 (EYETS). Current waveform and beam-based measurements were carried out in 2017 to validate the implemented design changes by observing the magnetic field impact on the beam. During these long-term measurements, increased values for the rise and fall times were observed when compared to single shot observations of the current waveform. An unknown source of jitter-like pre-firing in the main switch has been identified, creating an additional challenge to meet the already tight system rise and fall time specifications. This paper briefly describes the efforts made to fine tune the pulse generator after the EYETS, summarises the optimised configuration and analyses the observed jitter events. A new triggering system design is briefly outlined to address the issue.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2018-WEPMF075
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
WEPMF082 |
Design and Construction of the CERN PS Booster Charge Exchange Injection Chicane Bumpers |
2575 |
|
- B. Balhan, C. Baud, J.C.C.M. Borburgh, M. Hourican
CERN, Geneva, Switzerland
|
|
|
In the framework of the LIU project and the connection from LINAC4 to PS Booster, the 160 MeV H− beam will be injected horizontally into the PSB by means of one charge-exchange injection system for each PSB ring. A set of four outside vacuum pulsed dipole magnets (BSW) creating the required injection bump has been designed and built. The dynamic requirements for the bump ramp down determine, to a large extent, the field homogeneity due to the eddy currents induced in the corrugated Inconel vacuum chamber. Magnetic simulations were performed to determine the field harmonics during bump ramp down, and the results subsequently used for the dynamic tracking of the beam during injection. The mechanical design and construction of the magnets will be briefly outlined, and the article will conclude with the magnetic measurements of the magnets. The magnetic performance of the as built magnets will be compared with the simulations and the influence of the vacuum chambers on the magnetic field will be quantified.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2018-WEPMF082
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
WEPMF083 |
Comparison of Superconducting Septa Topologies and Parameter Space Exploration |
2578 |
|
- M.G. Atanasov, J.C.C.M. Borburgh, M. Hourican, A. Sanz Ull
CERN, Geneva, Switzerland
|
|
|
The unprecedented energy scale of the FCC poses challenging requirements for its magnetic elements including the septum magnets for injection and extraction. With an ambitious target field of 4 T and an apparent septum thickness of only 25 mm, different superconducting septa topologies have been investigated to explore their limitations. This article will cover the currently feasible topologies, amongst which the truncated cosine-theta, the double truncated cosine-theta, the superconducting shield (SuShi) and the so called stealth dipole. A performance figure of merit will be proposed, taking into account the maximum achievable magnetic field, the septum thickness and the leak field magnitude.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2018-WEPMF083
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|