Keyword: kicker
Paper Title Other Keywords Page
MOPP026 A Longitudinal Kicker Cavity for the BESSY II Booster cavity, booster, feedback, simulation 150
 
  • T. Atkinson, M. Dirsat, A.N. Matveenko, A. Schälicke, B. Schriefer, Y. Tamashevich
    HZB, Berlin, Germany
  • T. Flisgen
    FBH, Berlin, Germany
 
  As part of the global refurbishment of the injector systems at BESSY II, a new longitudinal kicker cavity and suitable feedback will be installed in the booster. Both a flexible bunch charge and spacing is essential for efficient injection. Such a cavity is needed to mitigate the unwanted couple bunch instabilities associated with these elaborate filling patterns and the HOMs of additional accelerating structures. This paper covers the conceptual design, simulation strategy, manufacture and bench tests of the longitudinal kicker cavity before it is installed in the ring.  
poster icon Poster MOPP026 [4.756 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IBIC2019-MOPP026  
About • paper received ※ 02 September 2019       paper accepted ※ 07 September 2019       issue date ※ 10 November 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPP028 Longitudinal Bunch-by-Bunch Feedback Systems for SuperKEKB LER feedback, operation, timing, cavity 159
 
  • M. Tobiyama, J.W. Flanagan, T. Kobayashi, S. Terui
    KEK, Ibaraki, Japan
  • J.D. Fox
    Stanford University, Stanford, California, USA
 
  Longitudinal bunch-by-bunch feedback systems to suppress coupled bunch instabilities with minimum bunch spacing of 2 ns have been constructed in SuperKEKB LER. Through the grow-damp and excite-damp experiments with several filling patterns and the transient-domain analysis of unstable modes, the behaviors of possible impedance sources have been evaluated. The measured performance of the system, together with the performance of the related systems such as slow phase feedback to the reference RF clock are reported.  
poster icon Poster MOPP028 [0.519 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IBIC2019-MOPP028  
About • paper received ※ 03 September 2019       paper accepted ※ 08 September 2019       issue date ※ 10 November 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPP031 Optimisation of the ISIS Proton Synchrotron Experimental Damping System damping, synchrotron, feedback, betatron 167
 
  • A. Pertica, D.W. Posthuma de Boer, R.E. Williamson
    STFC/RAL/ISIS, Chilton, Didcot, Oxon, United Kingdom
  • J. Komppula
    CERN, Meyrin, Switzerland
 
  The ISIS Neutron and Muon Source, located in the UK, consists of a H linear accelerator, a rapid cycling proton synchrotron and two extraction lines delivering protons onto heavy metal targets. One of the limiting factors for achieving higher intensities in the accelerator is the head-tail instability present in the synchrotron, around 2ms after injection. In order to mitigate this instability, an experimental damping system is being developed for the ISIS synchrotron. Initial tests using a split electrode BPM as a pickup and a ferrite loaded kicker as a damper showed positive results. This paper describes the different developments made to the damping system and planned improvements to optimize its performance for use in normal operations.  
poster icon Poster MOPP031 [1.557 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IBIC2019-MOPP031  
About • paper received ※ 04 September 2019       paper accepted ※ 09 September 2019       issue date ※ 10 November 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)