Paper |
Title |
Page |
MOPP031 |
Optimisation of the ISIS Proton Synchrotron Experimental Damping System |
167 |
|
- A. Pertica, D.W. Posthuma de Boer, R.E. Williamson
STFC/RAL/ISIS, Chilton, Didcot, Oxon, United Kingdom
- J. Komppula
CERN, Meyrin, Switzerland
|
|
|
The ISIS Neutron and Muon Source, located in the UK, consists of a H− linear accelerator, a rapid cycling proton synchrotron and two extraction lines delivering protons onto heavy metal targets. One of the limiting factors for achieving higher intensities in the accelerator is the head-tail instability present in the synchrotron, around 2ms after injection. In order to mitigate this instability, an experimental damping system is being developed for the ISIS synchrotron. Initial tests using a split electrode BPM as a pickup and a ferrite loaded kicker as a damper showed positive results. This paper describes the different developments made to the damping system and planned improvements to optimize its performance for use in normal operations.
|
|
|
Poster MOPP031 [1.557 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IBIC2019-MOPP031
|
|
About • |
paper received ※ 04 September 2019 paper accepted ※ 09 September 2019 issue date ※ 10 November 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
MOPP047 |
Design and Development of Beam Diagnostics for an FFA-FFA Ring for ISIS-II Upgrade Studies |
214 |
|
- E. Yamakawa
JAI, Oxford, United Kingdom
- S. Machida, A. Pertica, C.C. Wilcox
STFC/RAL/ISIS, Chilton, Didcot, Oxon, United Kingdom
|
|
|
The ISIS-II project aims to deliver a new spallation neu- tron source by 2034, driven by a 1.2 GeV proton accelerator capable of delivering a beam power of 1.25 MW with a rep- etition rate of 50 Hz or higher. One of the options for this future accelerator is a Fixed Field alternating gradient Accelerator (FFA). To demonstrate the suitability of FFAs for use in a user facility such as ISIS, there is a plan to construct a smaller scale proof of concept machine: FETS-FFA. Developing beam diagnostics for the FETS-FFA ring presents a challenge due to a large orbit excursion and aperture ( 60 mm x 700 mm). Diagnostics must cover the full size of beam chamber whilst still providing measurement sensitivity and resolution comparable to that seen in the ISIS synchrotron. This paper presents the current design and development of beam diagnostics for the FETS-FFA ring, including finite element studies of Beam Position Monitors (BPMs) and Ionisation Profile Monitors (IPMs).
|
|
|
Poster MOPP047 [9.355 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IBIC2019-MOPP047
|
|
About • |
paper received ※ 03 September 2019 paper accepted ※ 07 September 2019 issue date ※ 10 November 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
TUPP036 |
Performance of an In-Air Secondary Emission Grid Profile Monitor at the ISIS Neutron and Muon Source |
407 |
|
- D.W. Posthuma de Boer, C. Bovo, H.V. Cavanagh, B. Jones, A.H. Kershaw, A. Pertica
STFC/RAL/ISIS, Chilton, Didcot, Oxon, United Kingdom
|
|
|
The ISIS neutron and muon source, located in the UK, consists of an H− linear accelerator, a rapid cycling proton synchrotron and extraction lines to two target stations. A project is currently under way to replace the target assembly of the First Target Station (TS1) in order to secure its continued operation and improve operational flexibility. In addition to a number of other diagnostic tools, a new secondary emission (SEM) grid profile monitor is expected to be located within the helium atmosphere of the new target assembly. To investigate the performance of an out-of-vacuum SEM grid, a prototype monitor was positioned in-air between a beam exit window and a dump. Profile measurements taken with this monitor are presented, including tests at a range of bias voltages with a fast data acquisition system to investigate secondary signal sources.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IBIC2019-TUPP036
|
|
About • |
paper received ※ 04 September 2019 paper accepted ※ 07 September 2019 issue date ※ 10 November 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
TUPP037 |
Studies of the Time Structure of Ionisation Beam Profile Measurements in the ISIS Extracted Proton Beamline |
412 |
|
- C.C. Wilcox, W.A. Frank, A. Pertica, R.E. Williamson
STFC/RAL/ISIS, Chilton, Didcot, Oxon, United Kingdom
|
|
|
Ionisation Profile Monitors (IPMs) are used at the ISIS neutron and muon source to perform non-destructive transverse beam profile measurements. An in-house particle tracking code, combined with 3D CST modelling of the electric fields within the monitors, has been used to improve understanding of the various error sources within the IPMs, and shows close agreement with profile measurements in the synchrotron. To allow for detailed benchmarking studies, an IPM has been installed in Extracted Proton Beamline 1 (EPB1), enabling comparison with secondary emission (SEM) grid measurements. However, the IPM measurements taken in EPB1 show increased levels of profile broadening at operational beam intensities, which are not reproduced by SEM measurements or simulation. To investigate these differences, studies of the time structure of measured profiles are being performed. This paper details the development of new, high-speed multichannel data acquisition electronics, required to perform these studies. Resulting measurements are discussed, along with an analysis of the data¿s time structure and a comparison with that predicted by the IPM code.
|
|
|
Poster TUPP037 [1.102 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IBIC2019-TUPP037
|
|
About • |
paper received ※ 04 September 2019 paper accepted ※ 11 September 2019 issue date ※ 10 November 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|