SRF Accelerating Modules Upgrade for Flash Linac at DESY |
306 |
|
- D. Kostin, S. Barbanotti, J. Eschke, K. Jensch, N. Krupka, A. Muhs, D. Reschke, S. Saegebarth, J. Schaffran, P. Schilling, M. Schmökel, L. Steder, N. Steinhau-Kühl, A. Sulimov, E. Vogel, H. Weise, M. Wiencek, B. van der Horst
DESY, Hamburg, Germany
|
|
|
SRF accelerating modules with 8 TESLA-type 1.3 GHz SRF cavities are the main part of the linear accelerators currently in user operation at DESY, FLASH [1, 2] and the European XFEL [3, 4]. For the FLASH upgrade in 2022 [5] two accelerating modules have been exchanged in order to enhance the beam energy to 1.3 GeV. The two modules have been prototype modules for the European XFEL. After reassembly both modules were successfully tested and installed in the FLASH linac. Data taken during the commissioning at the end of 2022 did confirm the test results. This paper presents described efforts and their conclusions since last two years and continues the presentation given at SRF 2021 [6].
|
|
DOI • |
reference for this paper
※ doi:10.18429/JACoW-SRF2023-MOPMB082
|
|
About • |
Received ※ 16 June 2023 — Revised ※ 23 June 2023 — Accepted ※ 27 June 2023 — Issue date ※ 27 June 2023 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
WEPWB092 |
Test-Stand for Conditioning of Fundamental Power Couplers at DESY |
797 |
|
- K. Kasprzak, Th. Buettner, A. Gössel, D. Klinke, D. Kostin, C. Müller, E. Vogel, M. Wiencek
DESY, Hamburg, Germany
|
|
|
During the construction of the European-XFEL, activities related to Fundamental Power Couplers (FPCs) were outsourced to external partners and the former FPC test-stand area at DESY was given up due to infrastructure rearrangements. For the study of various XFEL upgrade scenarios a new test-stand for conditioning of FPCs at DESY is required. It will be used for evaluation of new coupler preparation methods with particular emphasis on Continuous Wave (CW) and long RF pulse operation. The new test-stand has been recently commissioned. Four FPCs have been prepared and tested. RF pulses were applied to the couplers, starting with the shortest possible pulse and increasing it’s power until maximum power was reached. The process was repeated with several pulse lengths until the maximum RF pulse length was reached. A review of the commissioning and first operation experience of the RF system are presented here.
|
|
DOI • |
reference for this paper
※ doi:10.18429/JACoW-SRF2023-WEPWB092
|
|
About • |
Received ※ 15 June 2023 — Revised ※ 24 June 2023 — Accepted ※ 26 June 2023 — Issue date ※ 16 July 2023 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|