Paper | Title | Page |
---|---|---|
MOPMB055 | CEA Contribution to the PIP-II Linear Accelerator | 234 |
|
||
The Proton Improvement Plan II (PIP-II) that will be installed at Fermilab is the first U.S. accelerator project that will have significant contributions from international partners. CEA joined the international collaboration in 2018 and will deliver 10 low-beta cryomodules as In-Kind Contributions to the PIP-II project, with cavities supplied by LASA-INFN (Italy) and VECC-DAE (India), and power couplers and tuning systems supplied by Fermilab. An important milestone was reached in March 2023 with the Final Design Review of the cryomodule, launching the pre-production phase. This paper presents the status CEA activities on the design, manufacturing, assembly and tests of the cryomodules and the upgrade of the existing infrastructures to the PIP-II requirements. | ||
DOI • | reference for this paper ※ doi:10.18429/JACoW-SRF2023-MOPMB055 | |
About • | Received ※ 25 June 2023 — Revised ※ 26 June 2023 — Accepted ※ 27 June 2023 — Issue date ※ 03 July 2023 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUPTB025 | Preparation of the Assembly of the 650 MHz Low Beta Cryomodules for the PIP-II Linear Accelerator | 442 |
|
||
The Proton Improvement Plan II (PIP-II) that will be installed at Fermilab is the first U.S. accelerator project that will have significant contributions from international partners. CEA¿s scope covers the supply of the 650 MHz low-beta cryomodule sections with the cavities provided by LASA-INFN (Italy) and VECC-DAE (India) as well as the power couplers supplied by Fermilab. This scope includes the assembly of the 650 MHz low-beta cryomodules. Assembly studies have been conducted based on CEA experience acquired on previous projects as well as on the feedback of Fermilab on the assembly of the HB650 prototype cryomodule. This paper presents the organization of assembly phases from the cavity string in the clean room and the assembly of the cryostat to the preparation of the cryomodule before its shipment to Fermilab. | ||
DOI • | reference for this paper ※ doi:10.18429/JACoW-SRF2023-TUPTB025 | |
About • | Received ※ 16 June 2023 — Revised ※ 23 June 2023 — Accepted ※ 29 June 2023 — Issue date ※ 07 July 2023 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUPTB027 | Cleanroom Assembly of the LIPAc Cryomodule | 452 |
|
||
In complement to the development activities for fusion reactors (JT-60SA & ITER), Fusion for Energy contributes to the R&D for material characterisation facilities. LIPAc is the technical demonstrator for the production and acceleration of a D+ beam that will be used for neutron production by nuclear stripping reaction on a liquid Li target. Since its first beam in 2014, the LIPAc construction and commissioning continues and will be concluded with the cryomodule installation, aiming for beam validation at nominal power. The cryomodule assembly, started in March 2019, was paused due to welding issues on the solenoid bellows. The slow pumping group used for the cleanroom assembly also needed improvement to overcome helium contamination. Two and half years were devoted to the pumping improvement and, repair, cold tests and high pressure rinsing of the solenoids. In August 2022, the cleanroom assembly resumed with the mounting of all power couplers to the SRF cavities. Despite good progress, the assembly had to be paused again to fix leaks on different vacuum components and a solenoid BPM port. This paper presents the issues faced and their solutions along the cold mass assembly. | ||
![]() |
Poster TUPTB027 [2.384 MB] | |
DOI • | reference for this paper ※ doi:10.18429/JACoW-SRF2023-TUPTB027 | |
About • | Received ※ 15 June 2023 — Revised ※ 24 June 2023 — Accepted ※ 29 June 2023 — Issue date ※ 16 July 2023 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
WEPWB063 | Final Design of the LB650 Cryomodule for the PIP-II Linear Accelerator | 721 |
|
||
The Proton Improvement Plan II (PIP-II) that will be installed at Fermilab is the first U.S. accelerator project that will have significant contributions from international partners. CEA joined the international collaboration in 2018, and its scope covers the supply of the 650 MHz low-beta cryomodule section, with the design of the cryostat (i.e the cryomodule without the cavities, the power couplers and the frequency tuning systems) and the manufacturing of its components, the assembly and tests of the pre-production cryomodule and 9 production modules. An important milestone was reached in April 2023 with the Final Design Review. This paper presents the detailed design of the 650 MHz low-beta cryomodules. | ||
DOI • | reference for this paper ※ doi:10.18429/JACoW-SRF2023-WEPWB063 | |
About • | Received ※ 21 June 2023 — Revised ※ 28 June 2023 — Accepted ※ 04 July 2023 — Issue date ※ 20 July 2023 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
SATUT01 |
Cryomodule Design | |
|
||
The lecture will give the basic for cryomodule design, fabrication, and assembly. Nicolas Bazin made the last SRF2021 online edition, and will make a more complete face to face lecture. | ||
![]() |
Slides SATUT01 [19.044 MB] | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
MOPMB057 | Implementation of the Test Bench for the PIP-II LB650 Cryomodules at CEA | 243 |
|
||
The Proton Improvement Plan II (PIP-II) at Fermilab is the first U.S. accelerator project that will have significant contributions from international partners. As a part of the French In-Kind Contributions to this project, CEA will provide ten 650 MHz low-beta cryomodules (LB650) equipped with LASA-INFN (Italy) and VECC-DAE (India) cavities and Fermilab power couplers and RF tuning systems. CEA is accordingly in charge of the design, manufacturing, assembly and testing of these cryomodules. This paper presents the future implementation of the test stand dedicated to the cryogenic and RF power testing of the LB650 cryomodules. The choice of the equipment and the current status will be detailed, as well. | ||
DOI • | reference for this paper ※ doi:10.18429/JACoW-SRF2023-MOPMB057 | |
About • | Received ※ 19 June 2023 — Revised ※ 23 June 2023 — Accepted ※ 26 June 2023 — Issue date ※ 05 July 2023 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUPTB035 | Design, Fabrication, and Test of a 175 MHz, β = 0.18, Half Wave Resonator for the IFMIF-DONES SRF-Linac | 477 |
|
||
The IFMIF-DONES facility will serve as a fusion-like neutron source for the assessment of materials damage in future fusion reactors. The neutron flux will be generated by the interaction between the lithium curtain and the deuteron beam from an RF linear accelerator at 40 MeV and nominal CW current of 125 mA. The last accelerating stage is a superconducting (SRF) Linac hosting five cryomodules. This SRF-Linac is equipped of two types of 175 MHz half wave superconducting cavities (HWRs). The first type of cavities (cryomodules 1 and 2), characterized by beta equal to 0.11, have been studied and qualified in the frame of IFMIF/EVEDA project. The development of the second type of cavities (cryomodules 3, 4 and 5), with higher beta of 0.18 is presented in this paper. A prototype has been designed, fabricated and tested in a vertical cryostat at CEA. The measured quality factor at nominal accelerating field (4.5 MV/m) is 2.3 109 and keeps higher than 109 up to 10 MV/m, which gives confidence in the cavity design and preparation to reach the expected performances after integration in the SRF linac. | ||
DOI • | reference for this paper ※ doi:10.18429/JACoW-SRF2023-TUPTB035 | |
About • | Received ※ 20 June 2023 — Revised ※ 24 June 2023 — Accepted ※ 29 June 2023 — Issue date ※ 15 July 2023 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |