Keyword: hardware
Paper Title Other Keywords Page
THPCAV008 Results From the Proton Power Upgrade Project Cavity Quality Assurance Plan cavity, cryomodule, linac, niobium 801
 
  • J.D. Mammosser, B.E. Robertson
    ORNL RAD, Oak Ridge, Tennessee, USA
  • R. Afanador, M.S. Champion, M.N. Greenwood, M.P. Howell, S.-H. Kim, S.E. Stewart, D.J. Vandygriff
    ORNL, Oak Ridge, Tennessee, USA
  • A. Bitter, K.B. Bolz, A. Navitski, L. Zweibäumer
    RI Research Instruments GmbH, Bergisch Gladbach, Germany
  • E. Daly, G.K. Davis, P. Dhakal, D. Forehand, K. Macha, C.E. Reece, K.M. Wilson
    JLab, Newport News, Virginia, USA
 
  Funding: UT-Battelle, LLC, under contract DE-AC05-00OR22725 with the US Department of Energy (DOE)
The Proton Power Upgrade (PPU) Project at Oak Ridge National Lab’s Spallation Neutron Source (SNS) is currently under construction. The project will double the beam power from 1.4 to 2.8 MW. This is accomplished by increasing the beam current and adding seven new Superconducting Radio Frequency (SRF) cryomodules. Each new cryomodule will contain four six-cell, beta 0.81, PPU style cavities. A quality assurance plan was developed and implemented for the procurement of 32 PPU cavities. As part of this plan, reference cavities were qualified and sent to Research Instruments Co. for the development and verification of process steps. Here we present the results from this plan to date.
 
DOI • reference for this paper ※ doi:10.18429/JACoW-SRF2021-THPCAV008  
About • Received ※ 04 June 2021 — Accepted ※ 06 September 2021 — Issue date ※ 16 May 2022  
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)