Paper | Title | Page |
---|---|---|
MOPCAV008 | CiADS and HIAF Superconducting Cavity Development Status and the Transition to Production Stage | 273 |
|
||
Funding: Work supported by Large Research Infrastructures "China initiative Accelerator Driven System’(Grant No.2017-000052-75-01-000590 ) Two accelerators facilities, China initiative Accelerator Driven Sub-critical System (CiADS) and High Intensity heavy-ion Accelerator Facility (HIAF), co-funded by the China central and local government, is being designed and constructed at Huizhou city, Guangdong Province. The Institute of Modern Physics(IMP), Chinese Academy of Science is responded for constructing and operating the facility. CiADS’s mission is to demonstrate the principle and technical of employing high power protons to transit fission nuclear plant wastes. HIAF is defined as a nuclear structure research facility. The two linacs contains six types , totally 233 superconducting cavities, will be constructed in recent three years. Stable production rate and reliable surface processing will be the main challenges. This paper reports the cavity design, prototype status and massive production plan and status. |
||
![]() |
Poster MOPCAV008 [2.258 MB] | |
DOI • | reference for this paper ※ doi:10.18429/JACoW-SRF2021-MOPCAV008 | |
About • | Received ※ 22 June 2021 — Revised ※ 10 December 2021 — Accepted ※ 04 February 2022 — Issue date ※ 10 April 2022 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
WEPCAV006 | 650 MHz Elliptical Cavities in IMP for CiADS Project | 594 |
|
||
Funding: Large Research Infrastructures "China initiative Accelerator Driven System"(Grant No.2017-000052-75-01-000590 ) and National Natural Science Foundation of China (Grant NO. 11805249) 650MHz multi-cell superconducting elliptical cavities with optimum beta equal to 0.62 and 0.82 were adopted in the driver linac of Chinese initiative Accelerator Driven Subcritical System (CiADS) to accelerate the 10 mA proton beam from 175 MeV up to 500 MeV, with the possibility to upgrade the energy to 1 GeV and higher. Mechanical design and optimization of the niobium cavity-titanium helium vessel assembly will be summarized in this paper. Vertical test results of three single cell prototype cavities will also be discussed, with comparisons with the simulation values. *Work supported by Large Research Infrastructures "China initiative Accelerator Driven System’(Grant No.2017-000052-75-01-000590 ) and National Natural Science Foundation of China (Grant NO. 11805249) |
||
![]() |
Poster WEPCAV006 [1.393 MB] | |
DOI • | reference for this paper ※ doi:10.18429/JACoW-SRF2021-WEPCAV006 | |
About • | Received ※ 21 June 2021 — Revised ※ 10 December 2021 — Accepted ※ 05 February 2022 — Issue date ※ 07 April 2022 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |