Paper | Title | Page |
---|---|---|
THPCAV008 | Results From the Proton Power Upgrade Project Cavity Quality Assurance Plan | 801 |
|
||
Funding: UT-Battelle, LLC, under contract DE-AC05-00OR22725 with the US Department of Energy (DOE) The Proton Power Upgrade (PPU) Project at Oak Ridge National Lab’s Spallation Neutron Source (SNS) is currently under construction. The project will double the beam power from 1.4 to 2.8 MW. This is accomplished by increasing the beam current and adding seven new Superconducting Radio Frequency (SRF) cryomodules. Each new cryomodule will contain four six-cell, beta 0.81, PPU style cavities. A quality assurance plan was developed and implemented for the procurement of 32 PPU cavities. As part of this plan, reference cavities were qualified and sent to Research Instruments Co. for the development and verification of process steps. Here we present the results from this plan to date. |
||
DOI • | reference for this paper ※ doi:10.18429/JACoW-SRF2021-THPCAV008 | |
About • | Received ※ 04 June 2021 — Accepted ※ 06 September 2021 — Issue date ※ 16 May 2022 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |