Author: Seberg, S.K.
Paper Title Page
TUPTEV016 Upgrade of the RHIC 56 MHz Superconducting Quarter-Wave Resonator Cryomodule 522
 
  • Z.A. Conway, R. Anderson, D. Holmes, K. Mernick, S. Polizzo, S.K. Seberg, F. Severino, K.S. Smith, Q. Wu, B.P. Xiao, W. Xu, A. Zaltsman
    BNL, Upton, New York, USA
 
  Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-SC0012704 with the U.S. Department of Energy.
In preparation for the 2023 RHIC sPHENIX experi-mental program the superconducting 56 MHz quarter-wave resonator cryomodule, used operationally for longitudinal bunch compression with up to 1 MV RF voltage, is being refit to accommodate an expected beam current of 418 mA per ring, an increase of ~1.5 relative to previous operation. The upgrades to the system include an improved fundamental mode damp-er, and dual function fundamental power and higher-order mode damper couplers. This paper will describe the preliminary testing, select subsystem changes and plans for testing the cryomodule prior to installation in the RHIC beam line in 2022.
 
DOI • reference for this paper ※ doi:10.18429/JACoW-SRF2021-TUPTEV016  
About • Received ※ 21 June 2021 — Revised ※ 09 February 2022 — Accepted ※ 22 February 2022 — Issue date ※ 28 April 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)