Paper |
Title |
Page |
SUPTEV013 |
Validation of the 650 MHz SRF Cavity Tuner for PIP-II at 2 K |
151 |
|
- C. Contreras-Martinez
FRIB, East Lansing, Michigan, USA
- S.K. Chandrasekaran, S. Cheban, G.V. Eremeev, F. Furuta, T.N. Khabiboulline, Y.M. Pischalnikov, O.V. Prokofiev, A.I. Sukhanov, J.C. Yun
Fermilab, Batavia, Illinois, USA
|
|
|
The PIP-II linac will include thirty-six β=0.61 and twenty-four β=0.92 650 MHz 5 cell elliptical SRF cavities. Each cavity will be equipped with a tuning system consisting of a double lever slow tuner for coarse frequency tuning and a piezoelectric actuator for fine frequency tuning. One dressed cavity equipped with an SRF tuner has been tested in the horizontal test stand at Fermilab. Results of testing the cavity-tuner system will be presented.
|
|
|
Poster SUPTEV013 [0.835 MB]
|
|
DOI • |
reference for this paper
※ doi:10.18429/JACoW-SRF2021-SUPTEV013
|
|
About • |
Received ※ 22 June 2021 — Revised ※ 13 August 2021 — Accepted ※ 26 February 2022 — Issue date ※ 02 May 2022 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
TUPCAV013 |
STC Qualification Tests of PIP-II HB650 Cavities |
465 |
|
- A.I. Sukhanov, S.K. Chandrasekaran, G.V. Eremeev, F. Furuta, S. Kazakov, T.N. Khabiboulline, T.H. Nicol, Y.M. Pischalnikov, O.V. Prokofiev, V. Roger, G. Wu, V.P. Yakovlev, J.C. Yun
Fermilab, Batavia, Illinois, USA
- C. Contreras-Martinez
FRIB, East Lansing, Michigan, USA
|
|
|
Design of the high beta 650 MHz prototype cryomodule for PIP-II is currently undergoing at Fermilab. The cryomodule includes six 5-cell elliptical SRF cavities with accelerating voltage up to 20 MV and low heat dissipation (Q0 > 3.3 · 10zEhNZeHn). Characterization of performance of fully integrated jacketed cavities with high power coupler and tuner is crucial for the project. Such a characterization of jacketed cavity requires a horizontal test cryostat. The Fermilab Spoke Test Cryostat (STC) has been upgraded to accommodate testing of 650 MHz cavities. Commissioning of upgraded STC has been reported at SRF’19 conference. In this paper we present results of testing of the prototype HB650 cavity in upgraded STC facility. We characterize cavity performance and qualify it for the prototype HB650 cryomodule assembly.
|
|
DOI • |
reference for this paper
※ doi:10.18429/JACoW-SRF2021-TUPCAV013
|
|
About • |
Received ※ 21 June 2021 — Accepted ※ 21 August 2021 — Issue date ※ 04 October 2021 |
|
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|