MOPCAV005 Status of SNS Proton Power Upgrade SRF Cavities Production Qualification 265
 
  • P. Dhakal, E. Daly, G.K. Davis, J.F. Fischer, D. Forehand, N.A. Huque, A.L.A. Mitchell, P.D. Owen
    JLab, Newport News, Virginia, USA
  • M.P. Howell, S.-H. Kim, J.D. Mammosser
    ORNL, Oak Ridge, Tennessee, USA
 
  The Proton Power Upgrade project at Oak Ridge National Lab’s Spallation Neutron Source (SNS PPU) currently being constructed will double the proton beam power from 1.4 to 2.8 MW by adding 7 additional cryomodules, each contains four six-cell high beta (\beta = 0.81) superconducting radio frequency cavities. The cavities were built by Research Instruments, Germany, with all the cavity processing done at the vendor site, including electropolishing as the final active chemistry step. All 28 cavities needed for 7 cryomodules were delivered to Jefferson Lab, ready to be tested. The cryogenic RF qualifications and helium vessel welding were done at Jefferson Lab. The performance largely exceed the requirements, and greatly exceeded the performance of the original SNS cavity production series. Here, we present the summary of RF test on production cavities to this date.
This manuscript has been authored by Jefferson Science Associates, LLC under U.S. DOE Contract No. DE-AC05-06OR23177.
 
poster icon Poster MOPCAV005 [1.065 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-SRF2021-MOPCAV005  
About • Received ※ 19 June 2021 — Revised ※ 10 July 2021 — Accepted ※ 12 March 2022 — Issue date ※ 06 April 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPTEV014 Managing Procurements in the Time of Covid-19: SNS-PPU as a Case Study 863
 
  • K.M. Wilson, G. Cheng, E. Daly, N.A. Huque, T. Huratiak, M. Laney, K. Macha, D.J. Maddox, M. Marchlik, P.D. Owen, T. Peshehonoff, M. Torres, M. Wiseman
    JLab, Newport News, Virginia, USA
 
  Funding: Supported by the Dept of Energy, Office of Nuclear Physics under contract DE-AC05-06OR23177 (JSA); and by UT-B which manages Oak Ridge National Laboratory under contract DE-AC05-00OR22725.
In early 2020, COVID-19 swept across the world. The accelerator industry, like many others, was impacted by disease, delays, shortages, and new working conditions. All Thomas Jefferson National Accelerator Facility (JLab) employees were sent home in mid-March 2020, with many still working remotely now. At the time, JLab was working on the Proton Power Upgrade (PPU) to the Spallation Neutron Source (SNS) at Oak Ridge National Laboratory (ORNL). Procurements had been placed and were being managed, parts were being received and inspected. This paper details the JLab procurement plan for the SNS PPU project, and the mitigations that were developed to continue to support this project smoothly under the limitations imposed by COVID-19.
 
poster icon Poster THPTEV014 [1.081 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-SRF2021-THPTEV014  
About • Received ※ 15 June 2021 — Revised ※ 30 November 2021 — Accepted ※ 21 January 2022 — Issue date ※ 01 May 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)