Author: Nishi, T.
Paper Title Page
MOOFAV01 Successful Beam Commissioning of Heavy-Ion Superconducting Linac at RIKEN 167
 
  • K. Yamada, T. Dantsuka, M. Fujimaki, E. Ikezawa, H. Imao, O. Kamigaito, M. Komiyama, K. Kumagai, T. Nagatomo, T. Nishi, H. Okuno, K. Ozeki, N. Sakamoto, K. Suda, A. Uchiyama, T. Watanabe, Y. Watanabe
    RIKEN Nishina Center, Wako, Japan
  • H. Hara, A. Miyamoto, K. Sennyu, T. Yanagisawa
    MHI-MS, Kobe, Japan
  • E. Kako, H. Nakai, H. Sakai, K. Umemori
    KEK, Ibaraki, Japan
 
  A new superconducting booster linac, so-called SRILAC, has been constructed at the RIKEN Nishina Center to upgrade the acceleration voltage of the existing linac in order to enable further investigation of new super-heavy elements and the production of useful RIs. The SRILAC consists of 10 TEM quarter-wavelength resonators made from pure niobium sheets which operate at 4.5 K. We succeeded to develop high performance SC-cavities which satisfies the required Q0 of 1E+9 with a wide margin. Installation of the cryomodule and He refrigerator system was completed by the end of FY2018, and the first cooling test was performed in September 2019. After various tests of the RF system, the beam acceleration was successfully commissioned in January 2020. In June 2020, the beam supply to the experiment was started. In this talk, I will report on the beam commissioning of SRILAC as well as the status of the frequency tuner and the differential pump system.  
DOI • reference for this paper ※ doi:10.18429/JACoW-SRF2021-MOOFAV01  
About • Received ※ 26 July 2021 — Revised ※ 30 August 2021 — Accepted ※ 05 March 2022 — Issue date ※ 16 May 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPFAV005 Operation Experience of the Superconducting Linac at RIKEN RIBF 315
 
  • N. Sakamoto, H. Imao, O. Kamigaito, T. Nagatomo, T. Nishi, K. Ozeki, K. Suda, A. Uchiyama, K. Yamada
    RIKEN Nishina Center, Wako, Japan
 
  After commissioning of the RIKEN superconducting linac (SRILAC) in the end of FY2019, heavy ion beams were provided to the nuclear physics experiments. In this paper operation history and evolution of field emission levels through the year will be presented.  
DOI • reference for this paper ※ doi:10.18429/JACoW-SRF2021-MOPFAV005  
About • Received ※ 02 July 2021 — Accepted ※ 27 October 2021 — Issue date ※ 10 April 2022  
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)