Author: Navitski, A.
Paper Title Page
WEOCAV06 SARAF-Phase 2 Low-Beta and High-Beta Superconducting Cavities Qualification 703
 
  • G. Ferrand, G. Jullien, S. Ladegaillerie, N. Misiara, N. Pichoff, C. Servouin
    CEA-IRFU, Gif-sur-Yvette, France
  • M. Baudrier, E. Fayette, L. Maurice
    CEA-DRF-IRFU, France
  • A. Navitski, L. Zweibäumer
    RI Research Instruments GmbH, Bergisch Gladbach, Germany
 
  CEA is committed to delivering a Medium Energy Beam Transfer line and a superconducting linac (SCL) for SARAF accelerator in order to accelerate 5 mA beam of either protons from 1.3 MeV to 35 MeV or deuterons from 2.6 MeV to 40 MeV. The SCL consists in four cryomodules. The first two identical cryomodules host 6 half-wave resonator (HWR) low beta cavities (β= 0.09) at 176 MHz. The last two identical cryomodules will host 7 HWR high-beta cavities (β = 0.18) at 176 MHz. The low-beta prototypes was qualified in 2019. Low-beta series manufacturing is on-going. The high-beta prototype was first tested in 2019 but failed. A new prototype was tested in the end of 2020. This contribution will present the results of the tests for low- and high-beta SARAF cavities, series and prototypes.  
DOI • reference for this paper ※ doi:10.18429/JACoW-SRF2021-WEOCAV06  
About • Received ※ 21 June 2021 — Revised ※ 17 October 2021 — Accepted ※ 20 December 2021 — Issue date ※ 17 May 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPCAV008 Results From the Proton Power Upgrade Project Cavity Quality Assurance Plan 801
 
  • J.D. Mammosser, B.E. Robertson
    ORNL RAD, Oak Ridge, Tennessee, USA
  • R. Afanador, M.S. Champion, M.N. Greenwood, M.P. Howell, S.-H. Kim, S.E. Stewart, D.J. Vandygriff
    ORNL, Oak Ridge, Tennessee, USA
  • A. Bitter, K.B. Bolz, A. Navitski, L. Zweibäumer
    RI Research Instruments GmbH, Bergisch Gladbach, Germany
  • E. Daly, G.K. Davis, P. Dhakal, D. Forehand, K. Macha, C.E. Reece, K.M. Wilson
    JLab, Newport News, Virginia, USA
 
  Funding: UT-Battelle, LLC, under contract DE-AC05-00OR22725 with the US Department of Energy (DOE)
The Proton Power Upgrade (PPU) Project at Oak Ridge National Lab’s Spallation Neutron Source (SNS) is currently under construction. The project will double the beam power from 1.4 to 2.8 MW. This is accomplished by increasing the beam current and adding seven new Superconducting Radio Frequency (SRF) cryomodules. Each new cryomodule will contain four six-cell, beta 0.81, PPU style cavities. A quality assurance plan was developed and implemented for the procurement of 32 PPU cavities. As part of this plan, reference cavities were qualified and sent to Research Instruments Co. for the development and verification of process steps. Here we present the results from this plan to date.
 
DOI • reference for this paper ※ doi:10.18429/JACoW-SRF2021-THPCAV008  
About • Received ※ 04 June 2021 — Accepted ※ 06 September 2021 — Issue date ※ 16 May 2022  
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)