Paper | Title | Page |
---|---|---|
MOOFAV05 | Proton Improvement Plan – II: Overview of Progress in the Construction | 182 |
|
||
Funding: US Department of Energy The Proton Improvement Plan II (PIP-II) project is an essential upgrade to Fermilab’s particle accelerator complex to enable the world’s most intense neutrino beam for LBNF/DUNE and a broad particle physics program for many decades to come. PIP-II will deliver 1.2 MW of proton beam power from the Main Injector, upgradeable to multi-MW capability. The central element of PIP-II is an 800 MeV linac, which comprises a room temperature front end followed by an SRF accelerator. The front end has been constructed and operated with (pulsed & CW) beam in the PIP-II Injector Test facility (PIP2IT). The SRF accelerator consists of five different types of cavities/cryomodules, including Half Wave Resonators (HWR), Single Spoke and elliptical resonators operating at state-of-the-art parameters. The first two PIP-II cryomodules, HWR and Single Spoke Resonator 1 (SSR1) are installed in PIP2IT and have accelerated beam to 17 MeV. PIP-II is the first U.S. accelerator project that will be constructed with significant contributions from international partners, including India, Italy, France, United Kingdom and Poland. The project was recently baselined, and site construction is underway |
||
DOI • | reference for this paper ※ doi:10.18429/JACoW-SRF2021-MOOFAV05 | |
About • | Received ※ 13 August 2021 — Revised ※ 14 January 2022 — Accepted ※ 21 February 2022 — Issue date ※ 13 March 2022 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |