Author: Jiang, T.C.
Paper Title Page
MOPCAV008 CiADS and HIAF Superconducting Cavity Development Status and the Transition to Production Stage 273
 
  • M. Xu, H. Guo, Y. He, S.C. Huang, Y.L. Huang, T.C. Jiang, C.L. Li, L.B. Liu, S.H. Liu, T. Liu, S.M. Shanab, T. Tan, Y. Tao, Y.Q. Wan, F.F. Wang, R.X. Wang, Z.J. Wang, P.R. Xiong, J.C. Yang, Z.Q. Yang, S.H. Zhang, S.X. Zhang
    IMP/CAS, Lanzhou, People’s Republic of China
  • E.Z. Zaplatin
    FZJ, Jülich, Germany
 
  Funding: Work supported by Large Research Infrastructures "China initiative Accelerator Driven System’(Grant No.2017-000052-75-01-000590 )
Two accelerators facilities, China initiative Accelerator Driven Sub-critical System (CiADS) and High Intensity heavy-ion Accelerator Facility (HIAF), co-funded by the China central and local government, is being designed and constructed at Huizhou city, Guangdong Province. The Institute of Modern Physics(IMP), Chinese Academy of Science is responded for constructing and operating the facility. CiADS’s mission is to demonstrate the principle and technical of employing high power protons to transit fission nuclear plant wastes. HIAF is defined as a nuclear structure research facility. The two linacs contains six types , totally 233 superconducting cavities, will be constructed in recent three years. Stable production rate and reliable surface processing will be the main challenges. This paper reports the cavity design, prototype status and massive production plan and status.
 
poster icon Poster MOPCAV008 [2.258 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-SRF2021-MOPCAV008  
About • Received ※ 22 June 2021 — Revised ※ 10 December 2021 — Accepted ※ 04 February 2022 — Issue date ※ 10 April 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPCAV014 The Development of a Prototype Fundamental Power Coupler for CiADS and HIAF Half Wave Resonators 295
 
  • T.C. Jiang, F. Bai, Y. He, Z.Q. Lin, Y.Q. Wan, R.X. Wang, Z.J. Wang, M. Xu, S.H. Zhang
    IMP/CAS, Lanzhou, People’s Republic of China
 
  More than 100 Half-wave resonators (HWR) will be adopted for China Initiative Accelerator Driven Sys-tem (CiADS) and High Intensity heavy-ion Accelerator Facility (HIAF) at IMP. Each HWR cavity equips with one variable coupling, dual-warm-ceramic fundamen-tal power coupler (FPC). The FPC should be able to transmit up to 30 kW in CW mode. This paper will give an overview of the RF design of the 162.5 MHz CW power coupler. The coupler employs two warm ceram-ics in a 50 Ω coaxial line to ensure operation relia-bility. The results of thermal and thermomechanical will also be reported. Two prototype couplers have been fabricated and the RF measurements with low RF power were carried out.  
poster icon Poster MOPCAV014 [1.128 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-SRF2021-MOPCAV014  
About • Received ※ 21 June 2021 — Accepted ※ 01 April 2022 — Issue date ※ 07 April 2022  
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)