Paper | Title | Page |
---|---|---|
MOPTEV002 | Extended Range SRF Cavity Tuner for LCLS II HE Project | 203 |
|
||
Funding: This manuscript has been authorized by Fermi Research Alliance LLC under Contract N. DE-AC02-07CH11359 with U.S. Department of Energy. The off-frequency detune method is being considered to be applied in the LCLS-II-HE superconducting linac to produce multi-energy electron beams for supporting multiple undulator lines simultaneously. To deliver off-frequency operation (OFO) requirements for SRF cavity tuner must be changed. Tuner design modifications and results of the testing eight cavity/tuner system, deployed in verification cryomodule (vCM), will be presented. |
||
![]() |
Poster MOPTEV002 [0.710 MB] | |
DOI • | reference for this paper ※ doi:10.18429/JACoW-SRF2021-MOPTEV002 | |
About • | Received ※ 22 June 2021 — Revised ※ 16 July 2021 — Accepted ※ 19 August 2021 — Issue date ※ 23 September 2021 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
THPFAV005 | LCSL-II Cryomodule Testing at Fermilab | 741 |
|
||
Funding: This manuscript has been authored by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the U.S. Department of Energy, Office of Science, Office of High Energy Physics. Cold powered testing of all LCLS-II production cryomodules at Fermilab is complete as of February 2021. A total of twenty-five tests on both 1.3 GHz and 3.9 GHz cryomodules were conducted over a nearly five year time span beginning in the summer of 2016. During the course of this campaign cutting-edge results for cavity Q0 and gradient in continuous wave operation were achieved. A summary of all test results will be presented, with a comparison to established acceptance criteria, as well as overall test stand statistics and lessons learned. |
||
![]() |
Poster THPFAV005 [1.383 MB] | |
DOI • | reference for this paper ※ doi:10.18429/JACoW-SRF2021-THPFAV005 | |
About • | Received ※ 22 June 2021 — Revised ※ 24 November 2021 — Accepted ※ 05 January 2022 — Issue date ※ 01 March 2022 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
THPTEV003 | LCLS-II Cryomodules Production Experience and Lessons Learned Towards LCLS-II-HE Project | 832 |
|
||
Funding: DOE LCLS-II is an upgrade project for the linear coherent light source (LCLS) at SLAC. The LCLS-II linac consists of thirty-five 1.3 GHz and two 3.9 GHz superconducting RF (SRF) continuous wave (CW) cryomodules with high quality factor cavities. Cryomodules were produced at Fermilab and at Jefferson Lab in collaboration with SLAC. Fermilab successfully completed the assembly, testing and delivery of seventeen 1.3 GHz and three 3.9 GHz cryomodules. LCLS-II-HE is a planned upgrade project to LCLS-II. The LCLS-II-HE linac will consist of twenty-three 1.3 GHz cryomodules with high gradient and high quality factor cavities. This paper presents LCLS-II-HE cryomodule production plans, emphasizing the improvements done based on the challenges, mitigations, and lessons learned from LCLS-II. |
||
![]() |
Poster THPTEV003 [0.620 MB] | |
DOI • | reference for this paper ※ doi:10.18429/JACoW-SRF2021-THPTEV003 | |
About • | Received ※ 21 June 2021 — Revised ※ 11 August 2021 — Accepted ※ 21 August 2021 — Issue date ※ 27 October 2021 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |