Author: Fite, J.M.
Paper Title Page
WEPTEV002 High Power Coupler Devepment for EIC 632
 
  • W. Xu, Z.A. Conway, J.M. Fite, D. Holmes, K.S. Smith, A. Zaltsman
    BNL, Upton, New York, USA
 
  Funding: This work is supported by Brookhaven Science Associates, LLC under Contract No. DE-SC0012704 with the U.S. Department of Energy.
The future EIC Electron storage ring at BNL needs to compensate up to 10 MW synchrotron loss with RF systems. The RF system relies on 34 fundamental power couplers to deliver RF power from power sources at room temperature to 17 SRF cavities at 2 K. Each power coupler will operate with 400 kW forward power, with full reflection for ~10% of time. We are developing two 1 MW coaxial FPCs at BNL, one with a BeO window and the other with an Al2O3 window. This paper will briefly summarize test results of high power test on the BeO window FPC , and then describe the development status of the Al2O3 window FPC.
 
poster icon Poster WEPTEV002 [3.397 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-SRF2021-WEPTEV002  
About • Received ※ 25 June 2021 — Revised ※ 28 January 2022 — Accepted ※ 05 April 2022 — Issue date ※ 12 May 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)