Paper | Title | Page |
---|---|---|
THP089 | Development of Superconducting RF Double Spoke Cavity at IHEP | 1114 |
SUSP010 | use link to see paper's listing under its alternate paper code | |
|
||
The China Spallation Neutron Source (CSNS) is de-signed to produce spallation neutrons. CSNS upgrade is planned to increase beam power by inserting a SRF linac after drift tube linac (DTL). IHEP is developing a 325MHz double spoke cavity at ¿0 of 0.5 for the CSNS SRF linac. The cavity shape was optimized to minimize Ep/Ea while keeping Bp/Ep reasonably low. Meanwhile, mechanical design was applied to check stress, Lorentz force detuning and microphonic effects, and to minimize pressure sensitivity. A new RF coupling scheme was pro-posed to avoid electrons hitting directly on ceramic win-dow. After fabrication and post processing of cavity, the cavity reached Bp of 120mT at Eacc = 13.8MV/m and Q0 = 1.72·1010 under vertical test at 2K. | ||
![]() |
Poster THP089 [2.176 MB] | |
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-SRF2019-THP089 | |
About • | paper received ※ 22 June 2019 paper accepted ※ 30 June 2019 issue date ※ 14 August 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
FRCAA5 |
SRF Activities and Progress at IHEP | |
|
||
There are several active SRF projects at IHEP, including HEPS, CEPC, CSNS upgrade, SHINE and PAPS SRF facility. Four cryomodules with 166.6 MHz β=1 QWR cavities are proposed for HEPS, while each cavity will providing 1.2 MV and 145 kW to the electron beam. The vertical and horizotal tests of the proof-of-principle cavities were recently conducted. 650 MHz 2-cell cavities and 1.3 GHz 9-cell cavities were proposed for the CEPC, and high Q technology is adopted by the project. Infrastructures are developed for the high Q study, while R&D on single-cell cavities are under-way. Efforts on learning mass-production of cavities and cavity-string were also made for both CEPC and SHINE projects. SRF linac from 80 MeV to over 300 MeV were adopted for the upgrade of CSNS, with 325 MHz Double-spoke cavities at β=0.50 and 650 MHz-5cell elliptical cavities at β=0.65. The PAPS SRF facility is biased on mass production for large SRF projects, i.e. aiming at assembly and testing of 200-400 cavities & couplers and 20 cryomodules per year. The equipment installation and commissioning is on going. The activities and progress of these SRF projects with be addressed in this presentation. | ||
![]() |
Slides FRCAA5 [13.318 MB] | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |