Paper | Title | Page |
---|---|---|
MOFAA3 | The FRIB SC-Linac - Installation and Phased Commissioning | 12 |
|
||
Funding: Work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC0000661. The Facility for Rare Isotope Beams (FRIB) superconducting (SC) driver linac is designed to accelerate all stable ions including uranium to energies above 200 MeV/u primarily with 46 cryomodules containing 324 quarter-wave resonators (QWR) and half-wave (HWR) resonators. With the newly commissioned helium refrigeration system supplying liquid helium to the QWR and solenoids, heavy ion beams including Ne, Ar, Kr and Xe were accelerated to the charge stripper location above 20 MeV/u with the first linac segment consisting of 15 cryomodules containing 104 QWRs of β=0.041 and 0.085 and 39 solenoids. Installation of cryomodules with β=0.29 and 0.53 HWRs is proceeding in parallel. Development of β=0.65 elliptical resonators is on-going supporting the FRIB energy upgrade to 400 MeV/u. This paper summarizes the SC-linac installation and phased commissioning status that is on schedule and on budget to the FRIB project. |
||
![]() |
Slides MOFAA3 [46.571 MB] | |
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-SRF2019-MOFAA3 | |
About • | paper received ※ 23 June 2019 paper accepted ※ 30 June 2019 issue date ※ 14 August 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
MOP072 | FRIB Solenoid Package in Cryomodule and Local Magnetic Shield | 235 |
|
||
Funding: U.S. Department of Energy Office of Science under Cooperative Agreement DE -SC0000661 FRIB cryomodule design has a feature: solenoid package(s) and local magnetic shields in the cryomodule. In this design, exposing SRF cavities to a very strong fringe field from the solenoid is concerned. A tangled issue between solenoid package design and magnetic shield one has to be resolved. FRIB made intensive studies, designed, prototyped, validated the solenoid packages and magnetic shields, and finally certified them in the bunker test. This paper reports activity results, and LS1 commissioning results in FRIB tunnel. This is a FRIB success story. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-SRF2019-MOP072 | |
About • | paper received ※ 24 June 2019 paper accepted ※ 14 August 2019 issue date ※ 14 August 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
THP063 | Inivestigation of the Possibility of High Efficiency L-Band SRF Cavity for Medium-Beta Heavy Ion Multi-Charge-State Beams | 1035 |
|
||
Funding: This work was supported in part by the U.S. National Science Foundation, under Grant PHY-1102511 and by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC0000661. The possibility of L-band SRF elliptical cavity in order to accelerate heavy ion multi-charge-state beams is being investigated for accelerating energy higher than 200 MeV/u. A first simple analytic study was performed and the result showed that the longitudinal acceptance of 1288 MHz is sufficient for heavy-ion multi-charge-state (5 charge states) medium-beta linac. Encouraged this result, detail beam dynamic simulation took place. The cryogenic heat load is also calculated for this linac with taken into consideration cavity doping technology. In this paper, a summary of the beam dynamics and cryogen-ic heat load calculations for 1288 MHz linac for heavy-ion multi-charge-state (5 charge states) medium-beta beams. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-SRF2019-THP063 | |
About • | paper received ※ 24 June 2019 paper accepted ※ 14 August 2019 issue date ※ 14 August 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |