MOP055 Fabrication and Performance of Superconducting Quarter-Wavelength Resonators for SRILAC 182
 
  • K. Suda, O. Kamigaito, K. Ozeki, N. Sakamoto, Y. Watanabe, K. Yamada
    RIKEN Nishina Center, Wako, Japan
  • H. Hara, A. Miyamoto, K. Sennyu, T. Yanagisawa
    MHI-MS, Kobe, Japan
  • E. Kako, H. Nakai, H. Sakai, K. Umemori
    KEK, Ibaraki, Japan
 
  A new superconducting booster linac (SRILAC) at the RIKEN heavy-ion linac is under construction. Ten 73-MHz low-beta quarter-wavelength resonators (QWRs) that operate at 4 K have been fabricated from pure niobium sheets. The cavity parts were assembled by electron beam welding. The resonant frequency for each cavity was adjusted by changing the lengths of the straight sections before welding. The performance and frequency were evaluated by vertical tests. All the cavities exceeded the design specifications of Q0 = 1x109 and Eacc = 6.8 MV/m. Details of the fabrication and frequency tuning as well as the performance of the cavities are reported.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-SRF2019-MOP055  
About • paper received ※ 17 July 2019       paper accepted ※ 13 August 2019       issue date ※ 14 August 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUP013 Non-Evaporative Getter-Based Differential Pumping System for SRILAC at RIBF 419
 
  • H. Imao
    RIKEN Nishina Center for Accelerator-Based Science, Wako, Saitama, Japan
  • O. Kamigaito, N. Sakamoto, T. Watanabe, Y. Watanabe, K. Yamada
    RIKEN Nishina Center, Wako, Japan
  • K. Oyamada
    SHI Accelerator Service Ltd., Tokyo, Japan
 
  Upgrades of the RIKEN heavy-ion linac (RILAC) involving a new superconducting linac (SRILAC) are undergoing to promote super-heavy element searches at the RIKEN radioactive isotope beam factory (RIBF). Stable ultra-high vacuum (<10-8 Pa) and particulate-free conditions are strictly necessary for keeping the performance of the superconductive radio frequency (SRF) cavities of the SRILAC. It is crucially important to develop neighboring warm sections to prevent contamination from the existing old RILAC and beamlines built almost four decades ago. In the present study, non-evaporative getter-based differential pumping systems were newly developed to achieve the pressure reduction from the existing beamline vacuum (10-5–10-6 Pa ) to the ultra-high vacuum within very limited length (<80 cm) ensuring the large beam aperture of more than 40 mm. They are also equipped with compact electrostatic particle removers. We will describe and discuss details of the design, construction and performance of the system.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-SRF2019-TUP013  
About • paper received ※ 03 July 2019       paper accepted ※ 14 August 2019       issue date ※ 14 August 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUP037 Construction of Superconducting Linac Booster for Heavy-Ion Linac at RIKEN Nishina Center 502
 
  • K. Yamada, T. Dantsuka, H. Imao, O. Kamigaito, K. Kusaka, H. Okuno, K. Ozeki, N. Sakamoto, K. Suda, T. Watanabe, Y. Watanabe
    RIKEN Nishina Center, Wako, Japan
  • H. Hara, A. Miyamoto, K. Sennyu, T. Yanagisawa
    MHI-MS, Kobe, Japan
  • E. Kako, H. Nakai, H. Sakai, K. Umemori
    KEK, Ibaraki, Japan
 
  At RIKEN Nishina Center, the RIKEN Heavy-Ion Linac (RILAC) is undergoing an upgrade of its acceleration voltage in order to allow it further investigation of new super-heavy elements. In this project, a new superconducting (SC) booster linac, so-called SRILAC, is being developed and constructed. The SRILAC consists of 10 TEM quarter-wavelength resonators made of pure niobium sheets which operate at 4 K. The target performance of each cavity is set as Q0 of 1×109 with its accelerating gradient of 6.8 MV/m. Recently we succeeded to develop high performance SC-cavities which satisfies the requirement with a wide margin. The cryomodule assembly is under way, and installation of cryomodules and He liquefaction system will be completed by the end of FY2018. The cooling-down test is scheduled in the Q1 of FY2019. This contribution makes a report on the construction status of the SRILAC.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-SRF2019-TUP037  
About • paper received ※ 02 July 2019       paper accepted ※ 04 July 2019       issue date ※ 14 August 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUP042 Measurement of Mechanical Vibration of SRILAC Cavities 513
 
  • O. Kamigaito, K. Ozeki, N. Sakamoto, K. Suda, K. Yamada
    RIKEN Nishina Center, Wako, Japan
 
  Mechanical vibration of quarter-wavelength resonators of SRILAC, the superconducting booster of the RIKEN heavy-ion linac, was measured during a vertical cold test. The measurements were performed for fully assembled cavities as well as for bare niobium cavities without the titanium jacket. In the procedure, the instantaneous resonant frequencies were measured for 10 seconds at a time interval of 1 ms and were recorded as a time series. The frequencies were analyzed by means of conventional signal analysis. The power spectrum was deduced from the autocorrelation function calculated with the fluctuation of resonant frequencies. Although the vibration amplitudes were smaller in the cavities assembled with the titanium jacket, we could not find a clear reason for this.  
poster icon Poster TUP042 [6.957 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-SRF2019-TUP042  
About • paper received ※ 27 June 2019       paper accepted ※ 30 June 2019       issue date ※ 14 August 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WETEB1 Development of Superconducting Quarter-Wave Resonator and Cryomodule for Low-Beta Ion Accelerators at RIKEN Radioactive Isotope Beam Factory 750
 
  • N. Sakamoto, T. Dantsuka, M. Fujimaki, H. Imao, O. Kamigaito, K. Kusaka, H. Okuno, K. Ozeki, K. Suda, A. Uchiyama, T. Watanabe, Y. Watanabe, K. Yamada
    RIKEN Nishina Center, Wako, Japan
  • H. Hara, A. Miyamoto, K. Sennyu, T. Yanagisawa
    MHI-MS, Kobe, Japan
  • E. Kako, H. Nakai, H. Sakai, K. Umemori
    KEK, Ibaraki, Japan
 
  A prototype cryomodule with a superconducting quarter- wave resonator (SC QWR) has been developed at RIKEN Radioactive Isotope Beam Factory (RIBF). During the last SRF conference, we presented the performance of our first SC QWR and the first cool-down test of its cryomodule. Since then, we have continued our efforts to improve cavity performance and succeeded in recovering deteriorated Q0. In this paper, we report what we constructed and learned from the prototype, including design issues with the cavity and its cryomodule. Design issues related to the new SC QWRs and their cryomodules for the SC linac booster of the RIKEN Heavy-Ion Linac (RILAC) are described as well.  
slides icon Slides WETEB1 [120.252 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-SRF2019-WETEB1  
About • paper received ※ 24 June 2019       paper accepted ※ 05 July 2019       issue date ※ 14 August 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)