Paper | Title | Page |
---|---|---|
MOFAB2 |
SRF Status of the SHINE Project at Shanghai | |
|
||
The talk will mainly introduce the progress of the SHINE project in China. It is scheduled to build SHINE project in seven years which includes a superconducting rf acceleractor based on TESLA technology. From 2018, SHINE started the prototypes R&D in China, including not only the cavities fabrication, but also the surface treatment methods to reach high Q performance. The preparition of test facility will be introduced, too. The plan and latest results will be reported in the talk. | ||
![]() |
Slides MOFAB2 [10.509 MB] | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |