The Facility for Rare Isotope Beams (FRIB) is under construction at Michigan State University (MSU). The FRIB superconducting driver linac will accelerate ion beams to 200 MeV per nucleon. The driver linac requires 104 quarter-wave resonators (QWRs, β = 0.041 and 0.085) and 220 half-wave resonators (HWRs, β = 0.29 and 0.54). The jacketed resonators are Dewar tested at MSU before installation into cryomodules. The cryomodules for β = 0.041, 0.085, and 0.29 have been completed and certified; 32 out of 49 cryomodules are certified via bunker test (as of March 2019). FRIB cryomodule needs 74 solenoid packages: 8-25 cm packages for 0.041 QWR CMs, 36-50 cm for 0.085 CMs, 12-50 cm for 0.29 CMs, and 18-50 cm for 0.53 CMs. The bunker certification completed 58 packages. All the magnets energized at FRIB goal (90 A/8 T for solenoid and 19 A/0.064 Tm for dipoles), all cavities tested at or above specified operating gradient. In this paper, we report the bunker test result.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-SRF2019-THP062  
About • paper received ※ 23 June 2019       paper accepted ※ 02 July 2019       issue date ※ 14 August 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)