Paper | Title | Page |
---|---|---|
WETEB8 | The Fundamental Power Coupler for CEPC Booster Cavity | 789 |
|
||
Funding: Supported by National natural Science Foundation of China ( 11475203) 96 Tesla type 1.3GHz 9-cell superconducting cavities, housed in eight 12m-long cryomodules, will be adopted for CEPC booster. Each cavity equips with one variable coupling, double-window fundamental power coupler (FPC). The FPC will operate at RF power up to 20 kW at quasi-CW mode. A variable coupling from 4·106 to 107 is required to meet different operation modes of Higgs, W and Z. A new coupler that employs a 50 Ω coaxial line with bellow structures, a cylindrical warm window, a coaxial planar cold window and a coupling adjusting actuator has been designed. Then two prototypes have been fabricated and high power tested up to CW 70 kW successfully. In this paper, the design, fabrication and high power test of the prototype FPCs will be presented. |
||
![]() |
Slides WETEB8 [9.971 MB] | |
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-SRF2019-WETEB8 | |
About • | paper received ※ 23 June 2019 paper accepted ※ 30 June 2019 issue date ※ 14 August 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
FRCAA5 |
SRF Activities and Progress at IHEP | |
|
||
There are several active SRF projects at IHEP, including HEPS, CEPC, CSNS upgrade, SHINE and PAPS SRF facility. Four cryomodules with 166.6 MHz β=1 QWR cavities are proposed for HEPS, while each cavity will providing 1.2 MV and 145 kW to the electron beam. The vertical and horizotal tests of the proof-of-principle cavities were recently conducted. 650 MHz 2-cell cavities and 1.3 GHz 9-cell cavities were proposed for the CEPC, and high Q technology is adopted by the project. Infrastructures are developed for the high Q study, while R&D on single-cell cavities are under-way. Efforts on learning mass-production of cavities and cavity-string were also made for both CEPC and SHINE projects. SRF linac from 80 MeV to over 300 MeV were adopted for the upgrade of CSNS, with 325 MHz Double-spoke cavities at β=0.50 and 650 MHz-5cell elliptical cavities at β=0.65. The PAPS SRF facility is biased on mass production for large SRF projects, i.e. aiming at assembly and testing of 200-400 cavities & couplers and 20 cryomodules per year. The equipment installation and commissioning is on going. The activities and progress of these SRF projects with be addressed in this presentation. | ||
![]() |
Slides FRCAA5 [13.318 MB] | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |