Paper | Title | Page |
---|---|---|
TUXAA01 | CEPC SRF System Design and Challenges | 332 |
|
||
Funding: Work supported by National Key Programme for S&T Research and Development of China (Grant NO.: 2016YFA0400400) CEPC is a 100 km circular electron positron collider operating at 90-240 GeV center-of-mass energy of Z, W and Higgs bosons. CEPC and its successor SPPC, a 100 TeV center-of-mass super proton-proton collider, will ensure the elementary particle physics a vibrant field for decades to come. The conceptual design report (CDR) of CEPC will be completed in the end of 2017 as an important step to move the project forward. In this contribution, CEPC SRF system CDR design and challenges will be introduced, including the system layout and parameter choices, configuration at different operation energies, transient beam loading and its compensation, cavity fundamental mode (FM) and higher order mode (HOM) induced coupled bunch instabilities (CBI) and the beam feedback requirement, etc. The SRF technology R&D plan and progress as well as the SRF infrastructure and industrialization plan are discussed at last. |
||
![]() |
Slides TUXAA01 [9.124 MB] | |
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-SRF2017-TUXAA01 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
WEYA04 |
The R&D on TEM-type SRF Cavities for High-current Applications at IHEP | |
|
||
Funding: This work has been supported partly by Pioneer 'Hundred Talents Program' of Chinese Academy of Science. The recent SRF R&D efforts on TEM-type cavities at IHEP have been strongly linked to two large projects: high current proton linac for ADS and High Energy Photon Source (HEPS). A CW 10 MeV proton injector and part of the 25 MeV main linac for the CADS project are developed at IHEP. 14 SRF spoke012 cavities for the injector have been commissioned with 10.6mA proton beam at 10.67MeV; while 6 SRF spoke021 cavities for the main linac have been assembled into cryomodule in Lanzhou. 166.6 MHz quarter-wave β=1 cavities were proposed for HEPS storage ring, required by the planned on-axis beam accumulation injection scheme. Each 166.6 MHz cavity will be operated at 4 K providing 1.2 MV accelerating voltage and 145 kW of power to the electron beam. A proof-of-principle cavity has been manufactured and vertical tested recently with a success. HOM damping is currently being designed. The development progress of the 6 types of spoke, HWR, QWR cavities, and their ancillaries, as well as the spoke cavity performance during beam operation, will be addressed. |
||
![]() |
Slides WEYA04 [2.904 MB] | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |