THYA05 |
Developments and Progress with ESS Elliptical Cryomodules at CEA-Saclay and IPN-orsay |
729 |
|
- F. Peauger, C. Arcambal, F. Ardellier, S. Berry, P. Bosland, A. Bouygues, E. Cenni, J.-P. Charrier, G. Devanz, F. Éozénou, A. Gaget, D. Gevaert, A. Gomes, T. Hamelin, X. Hanus, P. Hardy, V.M. Hennion, T.J. Joannem, C. Marchand, O. Piquet, J.P. Poupeau, B. Renard, P. Sahuquet, T. Trublet
CEA/DRF/IRFU, Gif-sur-Yvette, France
- C. Darve
ESS, Lund, Sweden
- G. Olivier
IPN, Orsay, France
|
|
|
CEA Saclay in collaboration with IPN Orsay is in charge of the ESS elliptical cavities cryomodule design, prototyping and series production. Two cryomodule prototypes are being developed and will be tested at CEA Saclay before starting the series production. The main cryomodule design features are first reminded. We present the cavities and couplers test results and the achieved assembly sequences of the first medium beta cavities cryomodule demonstrator M-ECCTD. The progress on the preparation of the CEA cryomodule test station is given. The procurement status and development plan of the second high beta demonstrator H-ECCTD are also reported. Finally we give the components procurement progress and the assembly strategy of the 30 series cry-omodules to be integrated at CEA before delivery to ESS at Lund.
|
|
|
Slides THYA05 [11.226 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-SRF2017-THYA05
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
MOPB076 |
Analysis of the Production, Installation and Commissioning of the European-XFEL Frequency Tuners |
235 |
|
- R. Paparella, A. Bosotti, D. Sertore
INFN/LASA, Segrate (MI), Italy
- C. Albrecht, S. Barbanotti, A. Bellandi, J. Branlard, K. Jensch, L. Lilje
DESY, Hamburg, Germany
- C. Cloué, T. Trublet
CEA/IRFU, Gif-sur-Yvette, France
- C. Madec
CEA, Gif-sur-Yvette, France
|
|
|
In the European-XFEL superconducting linac, mechanical frequency tuners equipped with stepper motors and piezoelectric actuators provide cold tuning of each of the 768 1.3 GHz cavities. More than 820 complete tuning systems were fabricated and pre-assembled in industry, tested at several stages before and after assembly and successfully commissioned during cryo-module cold tests at AMTF (DESY). Quality control strategy adopted to preserve the well-assessed tuner reliability through such a large-scale industrial production is critically reviewed and the lessons learned are presented in this paper. The statistical analysis of the large set of data acquired up to the recent commissioning of the entire linac is then summarized.
|
|