Author: Marhauser, F.
Paper Title Page
MOPB061 Suppression of Upstream Field Emission in RF Accelerators 246
 
  • F. Marhauser, S.V. Benson, D. Douglas
    JLab, Newport News, Virginia, USA
  • L.J.P. Ament
    ASML US Inc., Wilton, CT, USA
 
  Funding: Authored by Jefferson Science Associates, LLC under U.S. DOE Contract No. DE-AC05-06OR23177
So-called electron loading is the primary cause for cavity performance limitations in modern RF accelerating cavities. In superconducting RF cavities in particular, the onset of parasitic electron effects may start at field levels as low as a few MV/m. Electron loading can be attributed to mainly three phenomena: field emission, multiple impact electron amplification, and RF electrical breakdown. Field emission has been a persistent issue despite advances in SRF technology, whereas RF electrical breakdown and multipacting can be controlled by appropriate cavity design choices. Field emission becomes a major concern when the electrons emitted are captured by the accelerating RF field and directed along the beam axis through a series of cavities or even entire cryomodules. Consequently, electrons can accumulate energy comparable to that of the main beam over similar distances. This can represent a considerable dark current, which can travel downstream or upstream depending on the field-emitting site of origin. In this paper, a method is presented that can significantly suppress the upstream field emission by design.
 
Export • reference for this paper to ※ BibTeX, ※ LaTeX, ※ Text, ※ RIS/RefMan, ※ EndNote (xml)  
 
MOPB110 The Transfer of Improved Cavity Processing Protocols to Industry for LCLS-II: N-Doping and Electropolishing 418
 
  • C.E. Reece, F. Marhauser, A.D. Palczewski
    JLab, Newport News, Virginia, USA
 
  Funding: Authored by Jefferson Science Associates, LLC under U.S. DOE Contract No. DE-AC05-06OR23177 with supplemental funding from the LCLS-II Project U.S. DOE Contract No. DE-AC02-76SF00515.
Based on the R&D efforts of colleagues at FNAL, Cornell, and JLab, the LCLS-II project adopted a modification to the rather standard niobium SRF cavity surface processing protocol that incorporates a high temperature diffusion doping with nitrogen gas. This change was motivated by the resulting higher Q0 and the prospect of significantly lower cryogenic heat load for LCLS-II. JLab is responsible for managing the cavity procurement for the LCLS-II project. The first phase of the procurement action is to transfer the nitrogen-doping protocol to the industrial vendors. We also seek to exploit improvements in understanding of the niobium electropolishing process as part of the production processing of the TESLA-style LCLS-II cavities. We report on the technology transfer activities and progress toward the envisaged performance demonstration of vendor-processed cavities.
 
Export • reference for this paper to ※ BibTeX, ※ LaTeX, ※ Text, ※ RIS/RefMan, ※ EndNote (xml)  
 
TUPB003 Cavity Procurement and Qualification Plan for LCLS-II 529
 
  • F. Marhauser, E. Daly, J.A. Fitzpatrick
    JLab, Newport News, Virginia, USA
 
  Funding: Authored by Jefferson Science Associates, LLC under U.S. DOE Contract No. DE-AC05-06OR23177 with supplemental funding from the LCLS-II Project U.S. DOE Contract No. DE-AC02-76SF00515.
The LCLS-II project aims to build 35 accelerating cryomodules, which are based on the European XFEL design but modified for operation in CW mode. Each cryomodule houses eight TESLA-style nine-cell superconducting radio-frequency cavities. The activities to assemble the first two prototype cryomodules are ongoing at FNAL and JLab. 264 cavities worth of cavities for the remaining 33 cryomodules will be procured from two industrial vendors in similar quantity considering the option to produce spares. The assembly of cavities into the production cryomodules will be distributed among FNAL (16 cryomodules) and JLab (17 cryomodules). In this paper the cavity procurement and qualification plan for the LCLS-II project is detailed.
 
Export • reference for this paper to ※ BibTeX, ※ LaTeX, ※ Text, ※ RIS/RefMan, ※ EndNote (xml)  
 
THPB003 Calculations for RF Cavities with Dissipative Material 1056
 
  • F. Marhauser
    JLab, Newport News, Virginia, USA
 
  Funding: Authored by Jefferson Science Associates, LLC under U.S. DOE Contract No. DE-AC05-06OR23177
3D simulations have been performed for a variety of SRF cavities which incorporate Higher Order Mode dampers, either in form of coaxial couplers or waveguide dampers. Instead of utilizing the rather standard approach of matching the output port of the dampers with a broadband coaxial or waveguide port, dissipative materials are modelled for RF field absorption. This for instance not only avoids the otherwise required definition of the number of modes considered for damping, which has an impact on the computational time, but also allows tailoring the load material to conform with experimental data of e.g. non-perfect absorbers. The new calculation scheme is presented. Findings are partially compared with those achieved with the standard waveguide port approach by means of external quality factors. CPU speeds are briefly discussed for both approaches.
 
Export • reference for this paper to ※ BibTeX, ※ LaTeX, ※ Text, ※ RIS/RefMan, ※ EndNote (xml)  
 
THPB042 Advance Additive Manufacturing Method for SRF Cavities of Various Geometries 1181
 
  • P. Frigola, R.B. Agustsson, L. Faillace, A.Y. Murokh
    RadiaBeam, Marina del Rey, California, USA
  • G. Ciovati, W.A. Clemens, P. Dhakal, F. Marhauser, R.A. Rimmer, J.K. Spradlin, R.S. Williams
    JLab, Newport News, Virginia, USA
  • J. Mireles, P.A. Morton, R.B. Wicker
    University of Texas El Paso, W.M. Keck Center for 3D Innovation, El Paso, Texas, USA
 
  An alternative fabrication method for superconducting radio frequency (SRF) cavities is presented. The novel fabrication method, based on 3D printing (or additive manufacturing, AM) technology capable of producing net-shape functional metallic parts of virtually any geometry, promises to greatly expand possibilities for advance cavity and end-group component designs. A description of the AM method and conceptual cavity designs are presented along with material analysis and RF measurement results of additively manufactured niobium samples.  
Export • reference for this paper to ※ BibTeX, ※ LaTeX, ※ Text, ※ RIS/RefMan, ※ EndNote (xml)  
 
THPB110 Procurements for LCLS-II Cryomodules at JLab 1405
 
  • E. Daly, G. Cheng, G.K. Davis, T. Hiatt, N.A. Huque, F. Marhauser, H. Park, J.P. Preble, K.M. Wilson
    JLab, Newport News, Virginia, USA
 
  Funding: This work was supported by the LCLS-II Project and the U.S. Department of Energy, Contract DE-AC02-76SF00515.
The Thomas Jefferson National Accelerator Facility is currently engaged, along with several other DOE national laboratories, in the Linac Coherent Light Source II project (LCLS II). The SRF Institute at Jefferson Lab will be building 1 prototype and 17 production cryomodules based on the TESLA / ILC / XFEL design. Each cryomodule will contain eight nine cell cavities with coaxial power couplers operating at 1.3 GHz. Procurement of components for cryomodule construction has been divided amongst partner laboratories in a collaborative manner. JLab has primary responsibility for six procurements include the dressed cavities, cold gate valves, higher-order-mode (HOM) and field probe feedthroughs, beamline bellows cartridges, cavity tuner assemblies and HOM absorbers. For procurements led by partner laboratories, JLab collaborates and provides technical input on specifications, requirements and assembly considerations. This paper will give a detailed description of plans and status for JLab procurements.
 
Export • reference for this paper to ※ BibTeX, ※ LaTeX, ※ Text, ※ RIS/RefMan, ※ EndNote (xml)