Paper | Title | Page |
---|
WEP16 | Commissioning of BEPCII superconducting RF system | 477 |
| - Y. Sun, G. W. Wang, W. M. Pan, Z. Q. Li, Q. Ma, H. Y. Lin, S. P. Li, K. He, Y. P. Liu, H. Huang, B. Xu, Q. Y. Wang, T. M. Huang
IHEP, CAS
| |
| BEPC single-ring machine had been upgraded to
BEPCII double-ring machine in the past four years, four
199.6MHz RT cavities were replaced by two 499.8MHz
superconducting cavities.
Two SRF stations of BEPCII had passed the first beam
commissioning, physical problems such as changing
frequency from 200MHz to 500MHz and compressing
the bunch length in colliding mode, have been solved
step by step. The engineering problems such as feeding
100KW beam power had also been solved. The SRF
system of BEPCII project had finished on schedule. This
paper gives a brief introduction to the commissioning of
the SRF system of BEPCII. | |
WEP44 | The construction of the RF system of BEPC II | 584 |
| - G. W. Wang, W. M. Pan, Y. Sun, Z. Q. Li, G. Y. Zhao, H. Y. Lin, Y. F. Xu, H. Huang, Q. Ma, B. Xu, Q. Y. Wang, Y. P. Liu, P. Sha, T. M. Huang, R. Liu, R. H. Zeng
IHEP, CAS - T. Furuya, S. Mitsunobu, K. Akai
KEK
| |
| In this article, we'll introduce the RF system of
BEPCII to readers. It consists of 4 subsystems:
superconducting cavity, high power klystron, cryogenic
system and LLRF. The construction of the RF system had
been finished in late 2006. During the last year of running
till now, it has performed very well. | |