MO405 | Construction and Commissioning of KEKB Superconducting Crab Cavities | 63 |
| - K. Hosoyama, K. Hara, A. Honma, A. Kabe, Y. Kojima, Y. Morita, H. Nakai, K. Nakanishi, K. Akai, K. Ebihara, T. Furuya, S. Mitsunobu, M. Ono, Y. Yamamoto
KEK - K. Okubo, K. Sennyu, H. Hara, T. Yanagisawa
MHI Kobe
| |
| The superconducting crab cavities for KEKB were
constructed and installed into KEKB electron-positron
collider in January 2007. After cool-down of the crab
cavities, the commissioning of the crab cavities started in
February 2007 and continued until end of June. Effective
head on collision of electron and positron has been
achieved successfully for the first time during this spring
operation of the KEKB. A luminosity of above
10^34/cm2/sec could be obtained at high beam currents
operation (1.3A in the low energy positron and 0.7A in
high energy electron). | |
 | Slides(PDF) | |
WEP27 | Horizontal tests for crab cavities in KEKB | 520 |
| - Y. Yamamoto, K. Akai, K. Ebihara, T. Furuya, K. Hara, T. Honma, K. Hosoyama, A. Kabe, Y. Kojima, S. Mitsunobu, Y. Morita, H. Nakai, K. Nakanishi, M. Ono
KEK - H. Hara, K. Sennyu, T. Yanagisawa
MHI Kobe - T. Kanekiyo
HITACHI - T. Nakazato
JASRI
| |
| Two Crab cavities were fabricated at KEK in 2006.
After the completion of the assembly, a horizontal test is
normally carried out for a superconducting cavity in KEK.
The horizontal test is an overall test for the cavity without
a beam. Both cavities achieved above an operational kick
voltage of 1.4MV. Although the HER (High Energy Ring
for electron) Crab cavity had no trouble, the LER (Low
Energy Ring for positron) had a trouble of tuner operation.
Due to the limited time, both cavities were installed into
the tunnel at the beginning of Jan. in 2007. After the beam
commissioning, it was found that this problem was not so
much significant for the operation. The LER Crab cavity
is being operated above 1A at present. | |
WEP57 | Commissioning and Beam Operation of KEKB Crab RF System | 632 |
| - K. Akai, K. Ebihara, T. Furuya, K. Hara, T. Honma, K. Hosoyama, A. Kabe, Y. Kojima, S. Mitsunobu, Y. Morita, H. Nakai, K. Nakanishi, M. Ono, Y. Yamamoto
KEK
| |
| Two heavily damped superconducting crab cavities were
installed in KEKB, one for the low-energy positron ring
(LER) and the other for the high-energy electron ring
(HER). After adjusting the RF system and conditioning the
cavities, beam operation started in February 2007. During
the four-and-a-half-month operation until summer shut
down, the crab cavities have been operating very stably
to conduct crab crossing experiment. They have shown
excellent performance with high stored beam currents up
to 1.7 A in the LER and 1.35 A in the HER. It was also
demonstrated that the crab crossing works at a high luminosity
over 10^34/cm2s that exceeds the KEKB design luminosity.
Machine tuning with crab crossing will continue
for achieving a big boost in luminosity, as expected from
beam-beam simulations. In this paper, we present an RF
system for the crab cavities, commissioning process, performance
of the crab cavities with high-current beams, and
beam-loading-related issues on the crabbing mode. | |