A  B  C  D  E  F  G  H  I  J  K  L  M  N  O  P  Q  R  S  T  U  V  W  X  Y  Z  

Labelle J.

PaperTitlePage
WEP53Operation of the SOLEIL RF system615
 
  • P. Marchand, H. Dias, M. Diop, M. ElAjjouri, J. Labelle, R. Lopes, M. Louvet, C. Monnot, F. Ribeiro, T. Ruan, R. Sreedharan, K. Tavakoli
    SOLEIL, Gif-sur-Yvette
  • P. Bosland, P. Bredy, C. Madec
    CEA/DSM/DAPNIA, Gif-sur-Yvette
 
 The 352 MHz RF accelerating systems for the SOLEIL Booster (BO) and Storage Ring (SR) are in operation since mid 2006. In the BO, a 5-cell copper cavity of the CERN-LEP type is powered with a 35 kW solid state amplifier. In the SR, the required RF accelerating voltage (up to 4.4 MV) and power (560 kW at full beam current of 500 mA) will be provided by two cryomodules, each containing a pair of superconducting cavities, specifically designed for SOLEIL. The first cryomodule is operational, while the second one, which is being constructed by ACCEL (Germany), will be implemented in May 2008. Both cryomodules are cooled down to 4.2 K with liquid helium from a single 350 W liquefier and each cavity is powered by a 180 kW solid state amplifier. Using a single cryomodule and two amplifiers, the first objective of storing 300 mA stable beam was successfully achieved in 2006. The RF system commissioning and operation results are reported.