A  B  C  D  E  F  G  H  I  J  K  L  M  N  O  P  Q  R  S  T  U  V  W  X  Y  Z  

Kanekiyo T.

PaperTitlePage
TUP04Cryogenic System for the KEKB Crab Cavities106
 
  • H. Nakai, K. Hara, T. Honma, K. Hosoyama, A. Kabe, Y. Kojima, Y. Morita, K. Nakanishi
    KEK
  • T. Kanekiyo
    Hitachi Co.  LTD
  • T. Yanagisawa
    MHI Kobe
 
 The superconducting crab cavities, which change the direction of beam bunches to increase the luminosity of the KEKB accelerator, are successfully installed in the KEKB and operated with the stable operation of the large helium refrigerator for the KEKB. Since the crab cavities requires unique devices, such as long coaxial couplers, the cryostats for the crab cavities have various special features in their design and also in their cooling schemes. This paper describes such features and cooling schemes of the cryogenic system for the KEKB superconducting crab cavities. Calorimetric measurements on Q-factors of the crab cavities and static heat load (static loss) measurements of the crab cavity cryostats are carried out after the cryostat assembly. The results of these measurements are acceptable, and from these results, it is found that the crab cavity performance does not degrade so much during the cryostat assembly. 
WEP27Horizontal tests for crab cavities in KEKB520
 
  • Y. Yamamoto, K. Akai, K. Ebihara, T. Furuya, K. Hara, T. Honma, K. Hosoyama, A. Kabe, Y. Kojima, S. Mitsunobu, Y. Morita, H. Nakai, K. Nakanishi, M. Ono
    KEK
  • H. Hara, K. Sennyu, T. Yanagisawa
    MHI Kobe
  • T. Kanekiyo
    HITACHI
  • T. Nakazato
    JASRI
 
 Two Crab cavities were fabricated at KEK in 2006. After the completion of the assembly, a horizontal test is normally carried out for a superconducting cavity in KEK. The horizontal test is an overall test for the cavity without a beam. Both cavities achieved above an operational kick voltage of 1.4MV. Although the HER (High Energy Ring for electron) Crab cavity had no trouble, the LER (Low Energy Ring for positron) had a trouble of tuner operation. Due to the limited time, both cavities were installed into the tunnel at the beginning of Jan. in 2007. After the beam commissioning, it was found that this problem was not so much significant for the operation. The LER Crab cavity is being operated above 1A at present.