A  B  C  D  E  F  G  H  I  J  K  L  M  N  O  P  Q  R  S  T  U  V  W  X  Y  Z  

Ciapala E.

PaperTitlePage
WEP25Final tests and commissioning of the 400MHz LHC superconducting cavities512
 
  • P. Maesen, E. Ciapala, G. Pechaud
    CERN
 
 The four LHC RF modules, each containing four 400 MHz single cell cavities, were successfully completed and installed in the LHC tunnel in 2006. A number of minor modifications were made to the original construction to improve reliability in operation and to obtain tighter control on the otherwise large spread in the tuning ranges of individual cavities. After fitting of the variable power couplers, careful power processing was applied to bring all cavities to 8 MV/m, i.e. 1.5 times the nominal, and to the maximum 300 kW forward power. Reaching the goal of full performance without major incident has been the result of careful clean room assembly, careful vacuum operation and ensuring proper operation of all protection systems during RF operation. Preparation for operation in the LHC is now ongoing, where the modules will operate from same cryogenics distribution line as the LHC's superconducting magnets.