Author: Liu, Y.D.
Paper Title Page
MOBA02
The BEPCII commission and physical operation under high current and luminosity and its energy upgrade project  
 
  • Y.D. Liu
    IHEP, Beijing, People’s Republic of China
 
  The designed luminosity of BEPCII, 1 x 1033 cm-2 s⁻¹, was first achieved in 2016. After continuous optimization and improvement in recent years, the physical run at 1 x 1033 cm-2 s⁻¹ has been stable operation from January, 2023. Fist in this talk, the process for reaching 1 x 1033 cm-2 s⁻¹, are introduced and then some beam dynamics phenomena on accelerator physics will be explained. Now for the particle physical demand on BEPCII¿the collision energy will need to be upgraded to 2.35GeV, and the project on energy upgrade have been carried on. This energy upgrade scheme will be presented in this talk.  
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)