Paper | Title | Page |
---|---|---|
MOBH3 | CEPC Parameter Choice | 10 |
|
||
The 100km Double Ring configuration with shared super conducting RF systems has been defined as baseline by CEPC steering committee. CEPC is compatible with W and Z experiment. Requirement for energy acceptance of Higgs has been reduced to 1.1% by enlarging the ring to 100 km. For CDR, W and Z will use the same lattice as Higgs, and the luminosity for Z is at the level of 1034cm-2s-1. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-SAP2017-MOBH3 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |