Paper |
Title |
Page |
TUB07 |
The Conceptual Design of the 7.5 MeV/u Light Ion Injector |
51 |
|
- S.M. Polozov, A.E. Aksentyev, M.M. Bulgacheva, O.V. Deryabochkin, M.S. Dmitriyev, V.V. Dmitriyeva, M.V. Dyakonov, V.S. Dyubkov, A.V. Gerasimenko, A.A. Gorchakov, M. Gusarova, M.A. Guzov, E.N. Indiushnii, A.M. Korshunov, K.I. Kozlovskiy, A.S. Krasnov, M.V. Lalayan, Y. Lozeev, T.A. Lozeeva, A.I. Makarov, S.V. Matsievskiy, A.P. Melekhov, O.V. Murygin, R.E. Nemchenko, G.G. Novikov, A.E. Novozhilov, A.S. Panishev, V.N. Pashentsev, A.G. Ponomarenko, A.V. Prokopenko, V.I. Rashchikov, A.V. Samoshin, A.A. Savchik, V.L. Shatokhin, A.E. Shikanov, K.D. Smirnov, G.A. Tsarev, S.A. Tumanov, I.A. Yurin, M.I. Zhigailova
MEPhI, Moscow, Russia
- M.L. Smetanin, A.V. Telnov
VNIIEF, Sarov, Russia
- N.V. Zavyalov
RFNC-VNIIEF, Sarov, Nizhniy Novgorod region, Russia
|
|
|
The new linac for light ion beam injection is under development at MEPhI. Such linac was proposed for acceleration of 7.5 MeV/u ion beam with A/Z=1-3 and current up to 5 mA for proton and 0.4 pmA for light ions. The linac general layout will include two types of ion sources: ECR ion source for proton anf He ions and laser ion source for ions form Li to O. Following the LEBT ions will be bunched and accelerated to the final energy using RFQ section and 14 IH cavities. These IH-cavities will be identical (divided into two groups) and independently phased. All cavities will operate on 81 MHz. Results of the beam dynamics simulations and the cavities design will presented in the report.
|
|
|
Slides TUB07 [5.210 MB]
|
|
DOI • |
reference for this paper
※ doi:10.18429/JACoW-RuPAC2021-TUB07
|
|
About • |
Received ※ 16 September 2021 — Revised ※ 25 September 2021 — Accepted ※ 27 September 2021 — Issued ※ 14 October 2021 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
THA01 |
Status of the SC HWR Cavities Production for NICA Project |
85 |
|
- M. Gusarova, M.V. Lalayan, S.V. Matsievskiy, R.E. Nemchenko, S.M. Polozov, V.L. Shatokhin, N.P. Sobenin
MEPhI, Moscow, Russia
- A.V. Butenko, M.V. Lalayan, E. Syresin, G.V. Trubnikov
JINR, Dubna, Moscow Region, Russia
- D. Bychanok, S.A. Maksimenko
INP BSU, Minsk, Belarus
- V.S. Petrakovsky, I.L. Pobol, A.I. Pokrovsky, A. Shvedov, S.V. Yurevich, V.G. Zaleski
Physical-Technical Institute of the National Academy of Sciences of Belarus, Minsk, Belarus
- G.V. Trubnikov
JINR/VBLHEP, Dubna, Moscow region, Russia
|
|
|
Since 2015 the superconducting (SC) linac-injector development for Nuclotron NICA (JINR, Dubna, Russia) is carried out by the collaboration of JINR, NRNU MEPhI, INP BSU, PTI NASB. This new SC linac is to accelerate protons up to 20 MeV and light ions to 7.5 MeV/u with possible energy upgrade up to 50 MeV for proton beam. This paper reports the current status of the development and manufacturing of superconducting accelerating cavities for a new linear accelerator of the injection complex of the Nuclotron-NICA project.
|
|
DOI • |
reference for this paper
※ doi:10.18429/JACoW-RuPAC2021-THA01
|
|
About • |
Received ※ 26 September 2021 — Revised ※ 27 September 2021 — Accepted ※ 09 October 2021 — Issued ※ 24 October 2021 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|