Author: Kasaev, A.S.
Paper Title Page
TUY01 VEPP-2000 Collider Complex Operation in 2019-2021 Runs 28
 
  • M.V. Timoshenko, Yu. Aktershev, O.V. Belikov, D.E. Berkaev, D.B. Burenkov, V.P. Druzhinin, K. Gorchakov, G.V. Karpov, A.S. Kasaev, A.N. Kirpotin, S.A. Kladov, I. Koop, A.V. Kupurzhanov, G.Y. Kurkin, M.A. Lyalin, A.P. Lysenko, S.V. Motygin, A.V. Otboev, A.V. Pavlenko, E. Perevedentsev, V.P. Prosvetov, Yu.A. Rogovsky, A.M. Semenov, A.I. Senchenko, L.E. Serdakov, P.Yu. Shatunov, Y.M. Shatunov, D.B. Shwartz, V.D. Yudin, I.M. Zemlyansky, Yu.M. Zharinov
    BINP SB RAS, Novosibirsk, Russia
  • S.A. Kladov, I. Koop, M.A. Lyalin, A.V. Pavlenko, E. Perevedentsev, Yu.A. Rogovsky, A.I. Senchenko, P.Yu. Shatunov, Y.M. Shatunov, D.B. Shwartz
    NSU, Novosibirsk, Russia
  • Yu.A. Rogovsky
    Budker INP & NSU, Novosibirsk, Russia
  • A.M. Semenov
    BINP & NSTU, Novosibirsk, Russia
 
  VEPP-2000 is the only electron-positron collider operating with a round beam permitting to increase the limit of beam-beam effects. VEPP-2000 is the compact collider with 24.4 m-circumference which has record luminosity at energy up to 1 GeV per bunch (1032 1/cm2s), magnetic fields in superconducting solenoids (13 T) and in the bending magnets (2.4 T). Collider complex experimental program of 2019-2021 was focused on several energy ranges per bunch. Energy range in the second half of 2019 was 180-300 MeV, in the first half of 2020 ¿ 935-970 MeV, in the first half of 2021 - 970-1003.5 MeV. Data taking was carried out by CMD-3 and SND detectors and operation efficiency is compared with previous runs. Luminosity was limited by beam-beam effects. 2021 year was clouded by vacuum accident and subsequent intensive degassing using beam synchrotron radiation.  
slides icon Slides TUY01 [2.449 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-RuPAC2021-TUY01  
About • Received ※ 11 October 2021 — Accepted ※ 13 October 2021 — Issued ※ 23 October 2021  
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUA02 Current Status of VEPP-5 Injection Complex 37
 
  • Yu.I. Maltseva, A.V. Andrianov, K.V. Astrelina, V.V. Balakin, A.M. Barnyakov, A.M. Batrakov, O.V. Belikov, D.E. Berkaev, D. Bolkhovityanov, F.A. Emanov, A.R. Frolov, G.V. Karpov, A.S. Kasaev, A.A. Kondakov, N.Kh. Kot, E.S. Kotov, G.Y. Kurkin, R.M. Lapik, N.N. Lebedev, A.E. Levichev, A.Yu. Martynovsky, P.V. Martyshkin, S.V. Motygin, A.A. Murasev, V. Muslivets, D.A. Nikiforov, A.V. Pavlenko, A.M. Pilan, Yu.A. Rogovsky, S.L. Samoylov, A.G. Tribendis, S. Vasiliev, V.D. Yudin
    BINP SB RAS, Novosibirsk, Russia
  • A.V. Andrianov, V.V. Balakin, F.A. Emanov, E.S. Kotov, A.E. Levichev, Yu.I. Maltseva, D.A. Nikiforov, A.V. Pavlenko, Yu.A. Rogovsky
    NSU, Novosibirsk, Russia
  • A.G. Tribendis
    NSTU, Novosibirsk, Russia
 
  VEPP-5 Injection Complex (IC) supplies VEPP-2000 and VEPP-4 colliders at Budker Institute of Nuclear Physics (BINP, Russia) with high energy electron and positron beams. Since 2016 the IC has shown the ability to support operation of both colliders routinely with maximum positron storage rate of 1.7·1010 e+/s. Stable operation at the energy of 430 MeV has been reached. Research on further improvements on the IC performance is carried out. In particular control system was improved, additional beam diagnostics systems were developed, monitoring of RF system was upgraded. In this paper, the latest achieved IC performance, operational results and prospects are presented.  
slides icon Slides TUA02 [2.966 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-RuPAC2021-TUA02  
About • Received ※ 28 September 2021 — Revised ※ 01 October 2021 — Accepted ※ 09 October 2021 — Issued ※ 11 October 2021
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)