Paper |
Title |
Page |
TUX01 |
Status of the HIAF Accelerator Facility in China |
23 |
|
- J.C. Yang, D.Q. Gao, Y. He, L.J. Mao, G.D. Shen, L.N. Sheng, L.T. Sun, Z. Xu, Y.Q. Yang, Y.J. Yuan
IMP/CAS, Lanzhou, People’s Republic of China
|
|
|
The High Intensity heavy-ion Accelerator Facility (HIAF) is under constructed at IMP in China. The HIAF main feature is rapid acceleration of ions in the booster synchrotron ring (BRing) with the ramping rate up to 12 T/s. The challenges are related to the systems RF cavities, dipole power supplies, vacuum etc. Works on key prototypes of the HIAF machine are ongoing at IMP. In this paper, the test results of the power supplies, RF cavities and vacuum chambers are presented. As the construction of the HIAF facility has started, an overview of the hardware developments will also be reported.
|
|
|
Slides TUX01 [17.099 MB]
|
|
DOI • |
reference for this paper
※ doi:10.18429/JACoW-RuPAC2021-TUX01
|
|
About • |
Received ※ 13 September 2021 — Revised ※ 27 September 2021 — Accepted ※ 09 October 2021 — Issued ※ 20 October 2021 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|