Paper |
Title |
Page |
TUPSA25 |
Construction and RF Test of the Debuncher for NICA Light Ion Beam Line |
197 |
|
- D.A. Zavadtsev, D. Churanov, Y.Z. Kalinin, L.V. Kravchuk, V.V. Paramonov, A.A. Zavadtsev
RAS/INR, Moscow, Russia
- A.V. Butenko, A.V. Smirnov, E. Syresin
JINR, Dubna, Moscow Region, Russia
|
|
|
Debuncher is to be installed in the present beam line after the LU-20 linac in the light ion injector of the NICA facili-ty. The purpose of the debuncher is to reduce by a factor of up to ten the ion energy spread in the accelerated beam before injection into the Nuclotron. Relative ion speed is 0.1. Split-ring cavity driven from solid state RF amplifier at 145.25 MHz, should provide effective RF voltage up to 200 kV at 4 kW peak RF power. The RF controller allows adjust effective RF voltage for different ions: 58 kV for Z/A=1, 121 kV for Z/A=0.5 and 190 kV for Z/A=0.3. The debuncher cavity is provided with the stepper-motor driven capacitance tuner with 2 MHz tun-ing range.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-RUPAC2018-TUPSA25
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|