Author: Monchinsky, V.A.
Paper Title Page
TUZMH04 Status of the Nuclotron 49
 
  • A.O. Sidorin, N.N. Agapov, A.V. Alfeev, V. Andreev, A.A. Baldin, O.I. Brovko, V.V. Bugaev, A.V. Butenko, D.E. Donets, E.D. Donets, E.E. Donets, A.V. Eliseev, V.V. Fimushkin, E.V. Gorbachev, A. Govorov, E.V. Ivanov, V. Karpinsky, H.G. Khodzhibagiyan, A. Kirichenko, S.A. Kostromin, A.D. Kovalenko, O.S. Kozlov, K.A. Levterov, V.A. Mikhailov, V.A. Monchinsky, A. Nesterov, A.L. Osipenkov, S. Romanov, P.A. Rukojatkin, A.A. Shurygin, V. Slepnev, A.V. Smirnov, E. Syresin, A. Tuzikov, B. Vasilishin, V. Volkov
    JINR, Dubna, Moscow Region, Russia
  • A. Belov
    RAS/INR, Moscow, Russia
  • A.V. Philippov
    JINR/VBLHEP, Dubna, Moscow region, Russia
 
  Since last RuPAC two runs of the Nuclotron operation were performed. The run #54 performed in February ' March of 2017 was dedicated to polarized beam acceleration. One of the achievements was the acceleration of polarized proton beam performed at the Nuclotron for the first time. During the run #55 in February- April of 2018 the Nuclotron provided heavy ion beams for first fixed target experiments in the frame of the NICA scientific program. These and other results of the facility operation and development are presented.  
slides icon Slides TUZMH04 [17.667 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-RUPAC2018-TUZMH04  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)