Paper | Title | Page |
---|---|---|
TUPSA40 |
DC130: Next Step of the FLNR Accelerator Complex for Applied Science Activity | |
|
||
The main activities of Flerov Laboratory of Nuclear Reactions, following its name - are related to fundamental science, but, in parallel, plenty of efforts are paid for practical applications. Certain amount of beam time every year is spent for applied science experiments on FLNR accelerator complex. For the moment, the main directions are: the production of the heterogeneousμ- and nano-structured materials; testing of electronic components (avionics and space electronics) for radiation hardness; ion-implantation nanotechnology and radiation materials science. Basing on FLNR long term experience in these fields and aiming to improve the instrumentation, the accelerator department start the Design Study for new cyclotron DC130 which will be dedicated machine for applied researches in FLNR. Following the user's requirements DC130 should accelerate the heavy ions with mass-to-charge ratio A/Z of the range from 5 to 8 up to fixed energies 2 and 4.5 MeV per unit mass. The first outlook of DC130 parameters, its features, layout of its casemate and general overview of the new FLNR facility for applied science will be presented. | ||
![]() |
Poster TUPSA40 [1.675 MB] | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
THPSC49 |
ECR Ion Source DECRIS-PM for DC-280 Cyclotron | |
|
||
The paper presents the design of the DECRIS-PM ECR ion source developed for the DC-280 cyclotron which is under construction in FLNR JINR. The results of the tests of the source are presented. During the tests the intense beams of gaseous ions (900 eµA of Ar8+, 550 eµA of Ar9+, 160 eµA of Kr15+ etc.) and ions of solids (450 eµA of Mg5+, 220 eµA of Ca9+, 90 eµA of Ti9+ etc.) were produced. For the time being the source is assembled at the high voltage platform of the cyclotron axial injection system. The main engineering systems of the injector are assembled and tested, commissioning work is in progress. | ||
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |